My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989 JUL-DEC-ZBA APPEALS
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
1980-1989
>
1981
>
1989
>
1989 JUL-DEC-ZBA APPEALS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:14:02 PM
Creation date
11/17/2016 3:38:33 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• BOARD OF APPEALS John Malloy SP-87-04-032 Page 3. <br /> ;a <br /> Based upon the foregoing, the Board of Appeals has reached the following <br /> findings: <br /> 1. The walkway, dock, ramp and float will not unduly interfere with <br /> free passage of travel by water inasmuch as a dock on an abutting property <br /> extends further into the Great River than the Dock proposed by the Malloys. <br /> Moreoever, the Harbormaster has not expressed any opposition to construction <br /> of the Dock. <br /> 2. The Dock will not cause or contribute to the substantial disruption of <br /> the marine or coastal environment. As more fully set forth in the testimony <br /> and other evidence considered by the Board of Appeals, the Malloys agreed to <br /> redesign and reconfigure the Dock in accordance with recommendations of the <br /> Conservation Commission and the Shellfish Commission. Construction of the <br /> Dock as redesigned and reconfigured will cause no substantial disruption of <br /> the marine environment. As more fully set forth in the Shellfish Study <br /> submited by the Malloys, the standing crop of shellfish in the area of the <br /> proposed Dock is below the'threshhold ','rule of thumb" used by the Division <br /> s <br /> of Marine Fisheries for commercial and-recreational fishing. Moreover, <br /> construction of the Dock will temporarily disrupt only an approximately <br /> twelve square foot area within the Great River. The Board of Appeals also <br /> notes that opposition to the construction of the Dock was expressed by both <br /> abutters to Lot 166, and that both abutters currently maintain docks on their <br /> respective properties, one of which extends further into the Great River than <br /> the Dock proposed by the Malloys. <br /> Based upon the oral and written testimony received and considered <br /> by the Board of Appeals, the Board determined that granting this Special <br /> Permit would be in harmony with the general purpose and intent of the <br /> ordinance or by-law and would not be a detriment to the surrounding <br /> neighborhood. <br /> Upon motion duly made and seconded the Board of Appeals voted <br /> unanimously on June 14, 1989 to grant the Special Permit for construction <br /> of the Dock in accordance with Cape & Islands Surveying Plan 012489 <br /> dated January 24, 1989. <br />
The URL can be used to link to this page
Your browser does not support the video tag.