My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1970-1975-ZBA APPEALS - BLACKBOOK
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
1970-1979
>
1975
>
1970-1975-ZBA APPEALS - BLACKBOOK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 1:22:18 PM
Creation date
12/19/2016 10:00:33 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M.VN OYYICa, <br />712 MAIN <br />HYANNIS. MASS. <br />10171 ))5.2244 <br />CHARLES N. SAVERY. P.E.. A.L.S. <br />ALBERT A MORSE. P.E.. R.L.S. <br />ROBERT S. JOHNSON. P.E.. R.L.S. <br />EDGAR R FAT LTEN. P.E. <br />WILLIAM C. NYE. R.L.S. <br />ROBERT 8. ELDREDGE. 11 L.S <br />Mashpee Planning <br />Town of Mashpee <br />Mashpec, Mass. <br />Gentlemen: <br />SOUTH YARMOUTH DIVISION <br />33 NORTH MAIN <br />SOUTH YARMOUTH. MASS. <br />CHARLES N. SAVERY, INCORPORATED I6171 390.2246 <br />REGISTERED <br />PROFESSIONAL LAND MaMA[N on <br />ENGINEERS SURVEYORS AMUIC+ry "C.[TY CIVIL [NRIH[[wa <br />•Hu,cwn CO NynaAs •VNVNwO <br />CAPE COD uwA• u[oc avn VE,.. A •nolH[[wA <br />CAPE Coo SOCIETY ENGINEER[ A SURVEYORS <br />SOCIETY AMERICAN MlurAnr [NRm[u• <br />Moro 2, 1973 <br />Hoard <br />REPLY TO: Ilyannis <br />026.19 Re: Subdivision Plan of Santuit <br />Woods,, Section C <br />I have this day checked the plans and profiles of the above subdivision and <br />find that they conform to the requirements, of your board in every respect <br />except for the addition to the typical roadway section (4 foot shoulders to be <br />added) which the developer is in the process of delivering to me. The developer's <br />-estimated cost of the construction of the roads and drainage and the install- <br />ation of underground power is $116,000. We thin: this estimate is low. Our <br />estimate of the cost would be closer to $150,000. <br />We recommend that the road names be checked for duplication, and that the <br />following procedure b.e followed and that the Planning Hoard require an <br />inspection by the town engineer at three stages of road construction: <br />1. When gravel base is fine graded, and certified by a registered engineer <br />to meet the required standards; no bituminous binder course or road <br />oil shall be laid or applied until the town engineer has given the <br />developer or his agent a written "O.K." to proceed. <br />2. When the binder course of bituminous concrete has been laid; no finish <br />course shall be laid until the town eng neer has given the developer, or <br />his agent, a written "O.K." to proceed. <br />3. When all road construction, drainage,,ut:ility and other required <br />installations have been completed and a.l necessary road bounds set, <br />and a certification by a. registeredi engineer to this effect sent out <br />to the Hoard. <br />We also reconmlend that a final approval by the Planning Hoard be withheld until <br />it has been determined that the town engineer ha: been paid for his services. <br />I think if this procedure is followed, we will a,oid many of the difficulties <br />which we have had in .the past. <br />Very tru.y yours, <br />CIIN2I.FS 11. SAVERY, INC. <br />CNS:JP <br />CC: Mrs. Zena Nemetz + <br />Charles N. Savery <br />r( T <br />
The URL can be used to link to this page
Your browser does not support the video tag.