My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1986-ZBA APPEALS - BLACKBOOK
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
1980-1989
>
1986
>
1986-ZBA APPEALS - BLACKBOOK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2022 11:01:40 AM
Creation date
12/19/2016 10:01:27 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
460
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRAMAN ENGINEERING COMPANY <br /> March 28, 1986 <br /> Board of Appeals <br /> Town of Mashpee <br /> Dear Members : <br /> In reviewing the Order of Conditions prepared for Waterline <br /> Realty Trust (SE 43-525) please note that the statement is made <br /> that the project is located within the ACEC area. This is <br /> incorrect. <br /> This project is located approximately 500' south of the Waquoit <br /> Bay ACEC easterly boundry on the Great River. Enclosed is the <br /> narrative description and plan deliniating the actual boundry of <br /> the ACEC as developed by the Massachusetts Coastal Zone <br /> Management. On that plan, the location of the project is "X" in <br /> red. <br /> There will not be an appeal of the Order of Conditions. <br /> On behalf of Waterline Realty Trust and Barbara H. Dubin, Braman <br /> Engineering wishes to clarify this matter. <br /> Sincerely, <br /> David P. Anderson <br /> Braman Engineering Co. <br /> civil engineers &surveyors 258 main street buzzards bay, massachusetts 02532 759-8273/ 759-8148 <br />
The URL can be used to link to this page
Your browser does not support the video tag.