My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987 JAN-JUN-ZBA APPEALS
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
1980-1989
>
1987
>
1987 JAN-JUN-ZBA APPEALS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 3:16:22 PM
Creation date
12/19/2016 10:01:41 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bank- <br /> rerosion <br /> m Resowce Ares Type. Land Under the Ocean & Coastal Iden6lying number or terse. <br /> - - - of support documentsUnder the Ocean - The placing of 3-4" diameter <br /> & 2 - 6"x8" posts in land under the ocean <br /> not significantly affect sediment grain' size E-261ibution or water circulation. <br /> lgrass observed at the time of the field survey date: 3/9/87al Bank - The coastal bank is gently sloping. <br /> roposed construction will not significantly <br /> t the coastal bank' s ability to prevent storm <br /> e or erosion control. Any areas disturbed dur ng <br /> construction shall be planted with indigenous groun <br /> cover to prevent erosion: <br /> 2. Clearly,completely and accurately describe,with reference to supporting plans and calculations where <br /> necessary: <br /> (a) all measures and designs to regulate work within the Buffer Zone so as to insure that said work does <br /> not alter an area specified in Par-t I,Section 10.02(1) (a)of these regulations: or <br /> (b) if work in the Buffer Zone will alter such an area, all measures and designs proposed to meet <br /> the performance standards established for the adjacent resource area specified in Part II or <br /> Part III of these regulations. <br /> 0 coastal! Resource Area Type Bordered By 700-Fool Discretionary Zone: Identifying number or letter <br /> 0 inland - 01 support documents <br /> All work in the buffer zone shall be performed E-261 <br /> in a manner which will not adversely affect <br /> adjacent resource areas. <br /> 3-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.