My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989 JAN-JUN-ZBA APPEALS
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
1980-1989
>
1989
>
1989 JAN-JUN-ZBA APPEALS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:14:01 PM
Creation date
12/19/2016 10:02:29 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l'lsiun of �7LiMSh�JPE <br /> P. O. BOX 1108 <br /> ri)B MASHPEE, MA 02649 <br /> BOARD OF APPEALS <br /> DECISION <br /> FOR A VARIANCE <br /> RE: Petition of Karen Carroll for a Variance <br /> Case: V-89-03-35 <br /> A Petition was filed by Karen Carroll of Sherborn, Massachusetts <br /> for a Variance for permission to vary the restrictions of the Flood <br /> Plain Zone Provisions in an R-3 Zoning District on property located at <br /> 21 Squaws Lane (Map 117, Block 76) Mashpee, Massachusetts. <br /> Notice was duly given to abutters in accordance with Massachusetts <br /> General Laws Chapter 40A. Notice was given by publication in the Falmouth <br /> Enterprise, a newspaper of general circulation in the Town of Mashpee on <br /> April 10 and April 17, 1989, a copy of which is attached and made a part hereof. <br /> A public hearing was held on the Petition at the Mashpee Town Hall <br /> on Wednesday, April 26, 1989 at 7:30 p.m. at which time the following <br /> members of the Board of Appeals were present and acting throughout: <br /> William J. Hanrahan, Cheryl A. Hawver and Edward M. Govoni. <br /> The Board was informed that the applicant had done extensive <br /> remodelling to a 30-year old home and replaced the heating and hot <br /> water systems. The builder had not known the systems should have been <br /> moved to an upper floor until the work was completed. He now plans <br /> to build cement bunkers around the units. <br /> The Board determined that there would be substantial hardship in <br /> moving the utilities and that granting of the Variance would not result <br /> in increased flood heights or threats to public safety. The Board agreed <br /> to notify the applicant in writing that the actuarial rates may increase <br /> as the first floor elevation level increases risk to life and property. <br />
The URL can be used to link to this page
Your browser does not support the video tag.