Laserfiche WebLink
Board of Appeals Minutes - March 22, 1989 Page 5. <br />The size of 11B was originally projected at 45,905 square feet but <br />• Mr. Storrs explained that final plans on all buildings were resulting in <br />some increases in size. <br />Mr. Storrs discussed the residential units and said 9 units were <br />originally planned for Building 15 and none for 11B. He asked the Board <br />to permit the transfer of the residential units from Building 15 to <br />Building 11B. <br />He stated that the Variance request is to permit three stories <br />which architects felt was essential to anchor the corner. The <br />topography of the lot presented problems due to depressed levels. <br />He said that the CISV allowed 35' and the LSID allowed 40'. Design <br />Review has approved building. <br />Mr. Hanrahan read a letter from George Baker of the Fire Department <br />requesting a full sprinkler system including dry standpipe and that a. <br />fire alarm system be installed. He also stated that Mashpee Fire <br />Department does not own the proper ladders needed for the height of <br />these buildings. <br />Mr. Storrs replied that the building would have the sprinkler system, <br />dry standpipe and fire alarm. He stated that Fields Point reviews all <br />buildings with the Fire Department before contracts are prepared. <br />He said that the height of the floor elevation of the third floor is <br />26'. The Mashpee Fire Department tallest ladder is 31' and he thought <br />this would be sufficient to reach half way up from third floor for <br />rescue operations. <br />Mr. Makunas moved to grant the Special Permit for 11B to <br />permit the construction of a building of 49,565 square feet, <br />three storiesand 38' in height. The nine residential units originally <br />planned for Building 15 will now be transferred to Building 11B. <br />The permit is conditioned by the approval of the Fire Department. <br />Ms. Hawver seconded. All agreed. <br />Mr. Makunas moved to grant the Variance to allow a height of <br />38' and three stories in Building 11B. Ms. Hawver seconded. All agreed. <br />Mr. Storrs reviewed the usage designations from the original permit <br />and said Fields Point would now like to change Building 10 from restaurant <br />use to retail. He also asked for a change in the phasing program <br />since market conditions would dictate which buildings would be built. <br />Mr. Hanrahan suggested that completion date column be eliminated <br />but that Fields Point periodically review when new buildings are permitted. <br />Mr. Makunas moved to eliminate the date of completion column in the <br />phasing schedule and that Fields Point periodically review.completion <br />projections when new buildings are presented. Ms. Hawver seconded. All agreed. <br />. Mr. Hanrahan determined that the usage change on Building 10 was not <br />required since it was listed as retail on the 1986 and 1987 schedules. <br />Ms. Hawver moved to accept the minutes of the March 8 meeting. <br />Mr. Halpern seconded. All agreed. Meeting adjourned. <br />Elinor Walsh <br />