My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/11/2017 BOARD OF SELECTMEN Agenda Packet
TownOfMashpee
>
Town Clerk
>
Minutes
>
SELECT BOARD
>
AGENDA PACKETS
>
2010-2019
>
2017
>
09/11/2017 BOARD OF SELECTMEN Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2017 11:01:46 AM
Creation date
9/26/2017 11:01:47 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Agenda Packet
Meeting Date
09/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i all, <br /> NUNN <br /> - Does notaddress .Pro-Ion s useful fife of ex' <br /> stpg Very <br /> rydisruptive <br /> schedule <br /> •I� <br /> $25—$5 0 Mo <br /> ''$35-1' <br /> 55MillionBase Repairs goals orcorrect educational building. requiring swing space or illin <br /> deficiencies :extended,construction period <br /> over a number of summers <br /> Reno Only Would not meet all space Prolongs useful life of existing Very disruptive for at least $96 0 Million $123 - $125 M <br /> requirements.Improved building. three academic years. �' <br /> A.1 integration,of shops and Site access remains essentially Requires modular classrooms <br /> classrooms.Lacks as-is. for swing space.Limited <br /> collaborative space. access to core facilities during <br /> certain phases <br /> Add/Reno Would mostly meet space Prolongs useful life of existing Very disruptive for probably !$110.6 Million : $142 — $144 M <br /> requirements for academic building. three academic years.May <br /> B.1 areas with improved Improved main entrance require some modular <br /> collaborative spaces. location. - classrooms for swing space <br /> beyond the addition. <br /> Add/Reno/Dema Would mostly meet space Prolongs useful life of existing ' Very disruptive for probably $110.1 Million $141 — $143 M <br /> requirements for academic building. three academic years.Will <br /> B.2 areas with collaborative Improved main entrance and require significant modular <br /> spaces. Better integration of public access. classrooms as new <br /> 'shops and classrooms.Better construction can't begin until <br /> consolidation of academies. after demolition. <br /> New Would me et space Good entrance location,but Least disruptive impact on $115.6 Million $143 — $146 M <br /> requirements and educationl sits low on site.Maximizes existing school.Football field <br /> Construction goals available green space. Is unavailable during <br /> C.1 Separate'busand cardrop- construction. <br /> offs.Some expansion <br /> potential. <br /> New Would meetspace Good entrance location,sits Least disruptive impact on $113.1 Million $140 - $143 M <br /> requirements and educational high on site.Maximizes ex-sting school.Faculty <br /> Construction goals aiiiailable green space. parking is unava€€able <br /> C.2 Separate bus and cardrop during construction; <br /> offs.Some expansion alternative temporary parking <br /> potential. needed. <br /> New Would meet space Good entrance location,but some disruption on $114.5 Million ',$142.—$144 M <br /> requirements and educational sits low onsite.Maximizes existing school.Athletic fields <br /> Construction goals available green space. are unavailable during <br /> Separate bus aiid cardrop- construction. <br /> C"B offs.Close to abutters. <br /> Some expansion potential. <br />
The URL can be used to link to this page
Your browser does not support the video tag.