| 
								    MASHPEE ZONING BOARD OF APPEALS 
<br />MEETING MINUTES 
<br />MAY 242 2017 
<br />Also conditioned upon all department comments read into the record. 
<br />Mr. Pittsley seconded, yes, Mr. Furbush, yes, Mr. Blaisdell yes, and Mr. DeBarros, yes. 
<br />All were in favor of the Variance for the proposed garage based on all the conditions read 
<br />into the record. 
<br />5 Kanter Lane: Owner, Neal Kanter requests a Written Finding under §174-17 of the 
<br />Zoning Bylaws to raze and replace a single-family dwelling, deck and garage on property 
<br />located in an R3 Zoning District, Map 119 Parcel lA-0, Mashpce, MA. 
<br />5 Kanter Lane: Owner, Neal Kanter requests a Variance under §174-31 of the Zoning 
<br />Bylaws to raze and replace a single-family dwelling, deck and garage on property located 
<br />in an R3 Zoning District, Map 119 Parcel 1 A-0, Mashpee, MA. 
<br />Mr. Neal Kanter represented himself for the proposed raze and replace project. He said his 
<br />family has owned the property for over 50 years, and is currently just using the property as 
<br />a summer cottage. It was built roughly in the 1930's, and was remodeled many times over 
<br />the years and is currently uninhabitable due to the septic system failure. The current house 
<br />was there prior to the lot being subdivide and the road being constructed. He is proposing 
<br />to build a new house similar to the current house with a slight increase in the foot print 
<br />being 2 ft. toward Kanter Lane, and 1.5 ft. setback increase on the West side, the foundation 
<br />setback will increase from 7 ft. to 10 ft. 
<br />Mr. Bob Lynch and Diane Brace of 3 Seconsett Point Road are supportive of the project. 
<br />Mr. Bonvie read the Inspection Department comments into the record. Chairman Furbush 
<br />read the Board of Health and Conservation comments into the record. 
<br />Mr. Bonvie made a motion to issue a Written Finding for the raze and replace project at 5 
<br />Kanter Lane based on the Site Plan —Project: Sewage Disposal System Design, 5 Kanter 
<br />Lane, Mashpee, MA, Owner of record: Neal Kanter, 15 Ostrom Road, E. Falmouth, MA, 
<br />Applicant: Neal Kanter, 15 Ostrom Road, E. Falmouth, MA. Sheet No.: 1 of 1, Date: 
<br />3/24/2017, Drawing File Name: Kanter _ECP2, Prepared by: Cape & Islands Engineering, 
<br />Drawing Title: Septic Design Plan, Assessors Information: 119-1A-0. Signed by: Matthew 
<br />C. Costa, No. 52282, Professional Land Surveyor. Revision: l: Date: 5115117, Changed to 
<br />3 -Bedroom Design, By: MC, Appr: MC. Also conditioned upon all department comments 
<br />read into the record. 
<br />Mr. Blaisdell seconded, yes, Mr. Furbush, yes, Mr. Goldstein, yes, Mr. DeBarros, yes. All 
<br />were in favor of the raze and replace project at 5 Kanter Lane. 
<br />Mr. Bonvie made a motion to issue two Variances to Neal Kanter of 5 Kanter Lane, the 
<br />first variance is 27.6 feet on the front yard it is showing 12.4 ft., and the requirement is 40 
<br />ft., the second Variance would be on the West side, the requirement is 15 ft. and depicted 
<br />as only 12 ft., and the Variance will be in the amount of 3 ft. Referencing the same plot 
<br />plan and comments that were read into the record. 
<br />5 
<br />
								 |