My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/02/1993 CONSERVATION COMMISSION Minutes
>
12/02/1993 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2018 5:05:00 PM
Creation date
1/26/2018 11:04:38 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
12/02/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Conservation Commission <br /> December 21, 1993 <br /> Page 8. <br /> A <br /> Ms bamik asked if repairs to the wall would be less than the berm; they would. <br /> Ms Fantoi advised it is difficult to keep them watered and -growing. <br /> Mrs. Ferriday asked if there will be a pad under the pipe's Ms Fantozzi advised <br /> there will be some crushed stone to keep it level. <br /> ublic comments; none. ti <br /> ' o Motion made and seconded to close pending an on-site with the Agent and <br /> receipt of-DEF number and comments, <br /> Clom P DIM. <br /> 8:50 �� _ for Deternation of Applicability the installation of <br /> ground ater monitoring wells, river piezometers, and staff gauges at NOetinghouse <br /> Road, Falmouth Road and Old Barnstable Road, town land near the landfill, and the <br /> Trustees of Reservation land near and in Mashpee River. Mike Scipi,one presenting. <br /> Under closure requirements, this. <br /> would be the third study, <br /> Mr. Sherman stated it is on'a very steep slope. He should meet with the well <br /> driller ahead of time. Pollut=ion control should be on hand. it was left that <br /> he and Tom Foster would meet with the drilling rig contractor to work out erosion <br /> control and access. F <br /> Concerning the getable, they are waiting' for concurrance from DEF, about two <br /> weeks. ,. <br /> ' It was noted awf... 6cument is necessary, only a draft had been provided for <br /> the filing. flwi.tLhm..Ut--.loudlocum'"'nlat�ion,�`t Baas agreed the hearing should be continued <br /> CTD TO DECEMBER 16, 1993 - 8:50 p.m. <br /> Buffer Strips: Information from University of Rhode Island distributed, Language <br /> for Orders of Conditions on buffer strips provided also, <br /> Spec. Environmen Counsel: Letter received from McGregor & Shea expressing <br /> interest in representing the Town. <br /> VOTE: Notion made and seconded to send a letter of support for McGregor & 'Shea <br /> o the Executive Secretary, i <br /> .a <br /> Fa <br /> th Rnterprise: An article concerning the school site was distributed. The <br /> Agent advised he took offense at the comments made In this article by Dr. Petti. <br /> He offered to go to the site with the Architect but never beard from him, 'He does <br /> not want anyone who reads the article to m=isunderstand. <br /> The OoMnission was in '-agreement that a letter be sent to- the school eoma At tee, <br /> Mr. Fitts=ons stated it should be crafted so a s not to offend. I t will b <br /> crafted by the Agent and sent to- Ms Lannik for review.. <br /> CrEinbelTy Bog A tint: A summary of the meeting' n November 29th between the h ' <br /> Attendant and Agent was distributed for review. <br /> } <br /> e ." <br /> Concerning #6 - flume work, Mrs, 'Ferriday suggested the Grower deduct it' from the _ <br /> receipts. I t IsTi11 cost 1,220 to replace al 1 three flumes. be discussed at <br /> the e -ing next Tuesday._ <br />
The URL can be used to link to this page
Your browser does not support the video tag.