| 
								      		rdx�       conditions
<br />  				cont.
<br />  					,
<br /> 		13.    Active shellfish  beds  are  in  the  vic in-ity.    Therefore,  the  following good
<br /> 			preservatives  are forbidden:    creosote,  creosote/coal  tar,  creosote de  ivi.
<br /> 			tives,  Cuprinolt  pentachlorouhenol  or ehro ated copper arsenate.    Tolman
<br /> 			salt or OsMose K-33,  or  equivalent,  are permitted on wood above Mean  High       	i
<br />     				if applied  and  -rid
<br /> 			Water,       				before construction  of pier systems.    she use of
<br /> 			galvanized steel  piles,  Cedax or  lucu  t piles  or other untreated good piles
<br /> 			is  encouraged.
<br />		1  .    Any shellfish disturbed by  the driving -of the pilings  must be replanted at
<br /> 			applicant's  expense.
<br />    		.    Any disturbances  of natural vegetation must  b   replanted.
<br />		SE41181,  William P.  &  Evelyn  J.  Kiley,  Lot 272  Taff rail Way,  Mashpee
<br />		11.    The work shall  conform  to  the  following described plans  and additional.  con-
<br />			ditions:
<br />      																		on-
<br />			d .t  ons:    Plan  to  Accompany  Petition of William P.  & Evelyn Kiley  to Build
<br />			and Maintain a Dock,  Ramp and  Float on 111oponesset Creek,  Mashpee,  Ma.
<br />			Dated:    June  1 ,  1981,  Plans  Drawn  By:    Doyle Assoc. ,  Falmouth,  Ma.
<br />		1  ,  13,  14,  &  15  (See SE4 -179)
<br />      		-182,  Paula  J.  Hallett,  Lot  30  Waterline Drive North,  Mashpee,  Ma.
<br /> 		1.    The work  shall conform  to  the  follow-ling d.eseri  ed plans  and additional  con-
<br />			ditions:
<br />      																		on-
<br />			ditions:    Plan  to  Accompany Petition o   Paula J.  Hallett  to Build  'a  Maintain
<br />   			Dock and Ramp  on  Jehu Fond,  Mashpee,  Ma.    Dated:    June  1 ,  1981    Plans
<br />			Drawn By:    Doyle Associates,
<br />       	1  .    Dock and  Ramp shall' be con  tructed not greater than 55 feet from mean  high
<br />			grater.
<br /> 		3t  1  ,  1  ,  1    (Same as  #12,  13,  1  ,  15 on SE43-179)
<br />			1    ,  Robert W.  Gretchen Ann 13arvin,  Lot3     de Faun,  Mashpee
<br />       	11.    The work shall,  conform to  the following described plans  and additional  con-
<br />			ditions     Plan  to Accompany Petition of Rob't.   	Gretchen Darvin  to Build
<br />			and Maintain a. Dock     Ramp on    ehu Pond,  2 ashpee,  Ma.    Plans Dated:    June 1,
<br />			I  81,  Drawn By;    Doyle Assoc. ,  Falmouth,  Ma.
<br />       	12v  131  141     1    (See   @tO-     )
<br />       	S�   184,  Robert. S.  Flynn,  Lot 2  1  Taffrall Way,  Mash-Pee
<br />       	It.    The work shall  conform  to  the  following described plans  and additional  con-
<br />       		ditions:
<br />     																		on-
<br />       		d  t  oris:    Plan  to  Accompany    etition of Robert  5.  Flynn  to Build &  Maintain
<br />       		a  Dock,  Ramp & Float on  Ponconesset Creek,  : ashpee,  Ma. ,  Dated:    Jura  1p  1981,
<br />			Plans  D-1-ami    Doyle  Associates,  Falmouth,  Ma.
<br />       	1t  13v  14,      1    (See6E43-179)
<br />
								 |