| 
								     		Board  of  Health  Me-eting,  September  16,   19       (Page  2)
<br /> 		14 .    Copy  of  Town  of  Yarmouth  Landfill.  Rules  &  Regulations,  which  Judy
<br /> 		had  brought  into  office.    To  BE  STUDIED  AND  REVIEWED  BY  BOARD.
<br /> 		15.    See  Item      ,  phone  call  through  to  Town  Clerk  at  home,  Exhibit  'A'
<br /> 		to  become, part  of  the  agenda  of  this �me  ting, ;    GFB  SIGNED  WITH  A  VOTE
<br /> 		OF  2  to- 01  AS  CLERK  OF  THIS  BOARD,
<br /> 		16 .    Another  plan  for  addition  at  39  Ninigret  Ave  for  Mrs.  wall,   this
<br /> 		sketch  done  by  KEVIN  Hickey  of  Marstons  Mills,  who  is  not  licensed  in
<br /> 		this  Town,  however,  plan  not  explicit  without  necessary  distances  and
<br /> 		does  not  show what  is  to  be  done  with  existing  .subsurface  installation.
<br /> 		17.  Plan  for  Bruno,  wading  Place  Rd. ,  by  John  Jacoby,  unacceptable,  no,
<br /> 		signature,  distances  from  ahutte'rs  and  Bruno  well  not  shown.    To  BE  RE-
<br /> 		TURNED  To  JACOBY  FOR  CORRECTIONS
<br /> 		18.    Plans,  Besse,   13  Broomstick  way,   for  installation  of  full  loath  on
<br /> 		basement  level,  this  will  now  consist  of  three  full  baths.    CFB  REQUESTS
<br /> 		THAT  MR.  BESSE  SEND  A  LET'T'ER  To  THIS  BOARD  STATING  THE  GARBAGE  GRINDER
<br />		AT  THIS  RESIDENCE  HAS  BEEN  REMOVED,  THE  SYSTEM  1000  GAL  COULD  THEN  SER-
<br /> 		VICE- THE
<br />     																			ER-
<br />   		I  EITHE  BEDROOM  BATH  USE.
<br /> 		19 ..   GFB  had,    stated  that  he  had  received  a  call  from  Rep,  Torn  Gahir,
<br /> 		re:  testing  of  wells  at  Horseshoe  Bend  way/Tri  Town  Circle,  C.FB  had  ad-
<br />		vised  Tom  of  our  letter  to  Base  and  Rep  Cahir  assured  his  cooperation.
<br /> 		20 .     Roy  Woodward  from  Horseshoe  Bend  way  appeared  to  get  clarification
<br /> 		on  well  testing,  originally  to  begin  on  9/23/85 ,  revised  cyte  9/18/85,
<br />		however,   it  is  our  understanding  that  Falmouth  will  be  done  first.
<br /> 		21 .     Subdivision  plans:    Winslow  Properties:    Baord  requests  explanation
<br />		of  primary  well -area,  or,  if  individual  wells  are  to  used  plot  distances
<br />		well/septic,   if  primary  well  must  show  nitrate  loading:  are  lots  42-46
<br />		to  be  developed,  pit  between  lots  28 , 29  ghat  is  being  done  to  remove  the
<br /> 		illegally  deposit  of 'material  .in  that  area,   send  copy  of  DEE  letter  of
<br />		inspection  held  2/16/83  with  memo  to  Planner,  planning  hoard,   appeals.
<br />		Bayshore,   Inc,    Red] roo .  Rd.       OK  as .presented
<br />		Bashore/New  Seaury:    must  show  MDG  drains
<br />		Marsters  plan,   north  side  of  Ashumet  Pond:     reiterate  memo  of  Jan  1985
<br />		sent  to  Planning  Board  when  plan  was  submitted  as  "Ashumet  Ridge'  with
<br />		recommendation  that- Planning  Bd  require  that  west  well  be  taken  at  red
<br />		X  on  plan  at  drainage  ditch,   in  view  of  situation  to  left  of  project
<br />		To  be  monitored  for  volatiles,  TCP,  hydrocarbons,  tetrochlorethelyne.
<br />		Boudreau  (Sachem'    .Field)   located  SandwichMashpee  line :    Request  de-
<br />		veloper  to  show  faith  and  regard  for  future  home  owners  even  though  plan
<br />		was  submitted  just  days  prior  to  our  2/8/85  regulation  of  150 ' ,   they  are
<br />		to  show maximum  distances  from  well/septic.    MBG  drains  required.
<br />		Stable  Trust:     150 '  distance  well/septic,   show  nitrate  loading  of  load
<br />		factor  as  accepted  and  developed  by  CCP&EDC .
<br />		Northport  Realty  Trust:     Show  distance  well.  septic,  MDC  drains,  question
<br />		dimension  of  area,  refer  to  lard  use  of  otic  AFB.
<br />		Jonas  Drive:    Show  MDG  drains,  distance  well/septic,  land  compatibility  Otis.
<br />		Steeplechase :    Goldberg  zoino  report  for  230  condo  units   . ,there  will  be  on
<br />		site  treatment,  High wood  water.     Plan  to  be  further  studied.
<br />
								 |