								          	i
<br />    x
<br /> i
<br />   		TOWN OF  +&PEE, BIRD OF HEALTH, MEETING, DECEMBER 8, 1986
<br />    		1  .   Schemtic plans f r Transfer stab on as left by LEA group were d iu    dy Board, further
<br />   		discussion to be he 1 d later in ret i ng when Executive Secretary appears.
<br />    		13.  Approval af Gotu i t Bay public water supply by DEQE      					NOTED
<br />    		1  .   Copy of Barstab l e County Hea 1 th & Ener i rorenta l Depart proposal of Vo l at i 1 e Organ i s
<br />    		Compound Testing Program.   CHAIRMAN  LAWRENCE  THOUGHT  THE  MATERIAL  SHOULD
<br />    		BE  TAKEN  HOME  BY  MEMBERS  AND  STUDIED .
<br />    		1 ,,  Mfno, from Kathleen M. Davie, R.N., M.S., unity Nurse Consultant re: an analysis of the
<br />    		Public Heap l th Nurrs i ng Program Survey.       							NOTED ,   FILED
<br /> i
<br />    		16.   Carl Grassetti originally on the agenda to appear at   :00 p.m. called to west a postponewnt
<br />   		due to his physical problem.   CHA I RIM HERS VOTED TO ALLOW POSTPONEMENT UNTIL DECEMBER 151, -12'1q86
<br />    		17.   Percolation extension request, 19 W i l ann load.  MOT I ON CFB FOR S I x MOM, SECOND RLW to 6/8/8
<br />    		18.   Variance request 237 Highview  Briar ood  for occupancy.   VARIANCE ICED, DISCLAIMER SIGNED,
<br />   		MOTION CFBSECOND RL
<br />    		19,     V i sed plan for expansion of Gotu i t Bay Condos,, showing iess un i is     lower aggregate of the
<br />   		total of project.   BOARD DISAGREED WITH TOTALS AS SM AND REQUESTS THAT WILSON HILL AND NICK AU
<br />   		CORPORATION REPS APPEAR AT NEXT MEETING.
<br /> i
<br />   		20.   Plans for Fox Run (Hostetter)f-  Due to the lack of copies of hydrogen l og i ca 1 report of last
<br />   		mmting wherein the Board requested that additional copies be requested of BSO.   Plans deferred
<br />   		until requested copies are received and Board Viers have the opportunity to pease. MR B. EX-
<br />   		-PLAINED THAT THIS OUTFIT HAS A PKPM BEFORE THE TOWN WATER QUALITY COMMITTEE, THERE IS TOWN
<br />    		OWNED LAND ADJACENT TO THIS (INCIDENTALLY, [MR, B STILL SPEAKING] I HAD LOOKED THROUGH THIS RE-
<br />    		PRT AND THE ONLY THING I FOUND WITH IT THAT I DIDN'T PARTICULARLY CARE ABORT WAS T HE FACT THAT
<br />    		THEY ARE STILL THINKING OF USING CHLORINE AS A DISINFECTANT, AND WE DON'T WNAT THAT, SO I THINK
<br />    		THAT IS ONE CST WE CAN M (E.   [INTERJECT CHAIRMAN LAWRENCE:   " 1 THOUGHT WE TOLD THEM  THAT
<br />    		WHEN THEY DERE HERE"]    , B:   I THINK IT NEEDS A REVIEW EITHER FROM  SOMEONE FRONS UP AT CCP SEDC
<br />    		THAT WAS THE BIC THING THAT I HAD, OTHERWISE, THEY'RE FIGURES SEBM TO BE PRETTY {DOD AS FAR A
<br />    		USAGE AND DATER FLOWS BUT I WOULD WANT CHLORINATION BUT WHAT THEY'VE DONE WITH THEIR WATER SYSTEM
<br />    		IS  TO, THE TOWN WATER SURCH HAS A PUBLIC DIED PRDPE] TY THAT'S NEAR THIS, WHERE WE WANT TO GO
<br />    		IN AND TEST FOR THE WATER QUALITY AND QUANTITY.  WE DON'T HAVE THE MONEY TO DO THE DRILLING AND
<br />    		DO THE TESTING, YOU KNOW.   i DON'T THINK IT COMES AS MUCH OF A SURPRISE TO ANY OF USS' SO "T THEM
<br />    		HAVE PROPOSED AND AS WE UNDERSTOOD IT, THE WATER QUALITY IT HAS BEEN ACCEPABLE TO THE DATER CCK-
<br />    		MISSIONERS    THE SELECTMEN ACTING AS WATER C"IS.SIONERS  THAT THEY BE GIVEN PERMISSION TO CSD ONTO
<br />    		TSN OWNED -LAND, THAT WE'RE THAT  E I E TH I N1 I NG OF, AND, PUT IN WELLS AND TAME A WATER TEST FOR, TO
<br />    		DEMWINE HOW UH. QUANTITY THERE IS THER AND "T THE QUALITY IS AND SEE IF THE AREA SHOULD BE DE-
<br />    		VELOPED AS A WELL FIELD.   IF IT IS DEVELOPED AS A WELL FIELD, AND THIS WORK THEY DO IN THERE WILL
<br />    		BE A GIFT TO THE TOWN WITH THE 2121, WELLS, THAT THEM WOULD THEN BE WILLING TO ENTER INTO A CONVER-
<br />    		SATION-,:WITH
<br /> 																		ONVER-
<br />    		SATION, ITH THE TOWN TO PAY THE COST OF AN 8" WELL AND THE NECESSARY STEPS AND PROCEDURES TO GET
<br />    		THAT AS A TOWN DATER SUPPLY.   IT WOULD BECOME THEIR WATER SUPPLY AS A TCN WATER SUPPLY, BUT THEM
<br />    		WILL BE PAYING THE PART OF THE COST TO HELP DEVELOP IT, THEY WON'T TAKE THE WHOLE COST BUT THEY
<br />    		WILL HELP TO DEVELOP IT , THEN THEY  HOSTETTER  WOULD NOT DEVELOP THEIR OWN DATER SUPPLY, THEY
<br />    		WOULD BECOME CUSTOMERS OF THE TOWN.  AND THAT WOULD GIME US A W CUTOMER BASE IN THE AREA O
<br />    		TOWN WHERE WE DON'T HAVE TOO MANY CUSTOMERS CLOSE TOGETHER, SO IT WOULD CHEAPEN OUR TOWN REQUI .
<br />    		VMS, THAT's WHAT I LEARNED LAST E INTERRUPT THE CHAIR:   THERE'S THREE HUNDRED SOME ODD UNITS
<br />    		GOING IN THERE, 259 CONDOS AND THE REST A HIRED SOME ODD SITE FAMILY [NR. WILSON QUESTIONED
<br />    		IF THIS DEVELOPMENT WAS THE SAME AS THE ONE ELUDED TO IN THE ARTICLE OF THE CAPE COD TIMES FOR
<br />    		HOSTET TER] MR, B:   I DIDN'T SEE THE AH, YOU KNOW ONCE I GET INVOLVED WITH SONS OF THIS FROM THE
<br />    		TOWN`S ANGLE,  I, UNLESS IT REFERS TO THIS BOARD PERSONALLY , I DON I T LOONS AT WHAT'S IN THE PAPER
<br />    		BECAUSE I DEPEND ON THE MEETING THAT DISCUSSES IT AND NQS "TS GOING     RATHER THAN CET MYSELF
<br />    		CONFUSED WITH THE NEWSPAPER STORY, BUT, YES.IF THAT'S WHAT THEY DERE SAYING THEN THAT IS THE WAY
<br />    ObTHEY HOPE TO GO, BUT THE THING THAT BOTHERS ME WITH IT AND I'M MERING WHETHER, AND THIS IS O
<br />    		THE MIND'S OF THE WATER ADVISORY GROUP T002, GIVEN THE DIFFICULTIES WE'RE FINDING UP AROUND THE DIS_
<br />    					ER THIS 1S~•FAR-EW� AWAY SO THAT A BIG DRAW WONT FIiMER INUENCE THAT PLUME
<br />    		POSAL AREA  WEIETH	S
<br />    		TO CHANGE DIRECTION, BUT GIVEN WHAT THE COTUIT WATER COMPANY H     TOLD U  BECAUSE THEY HAVE A WELL
<br />    		THAT'S NORTH AND EAST OF THIS  IS THE AREA *ERE THEY GOT THEIR # MILLION GALLON OR FIVE MILLION
<br />
								 |