Laserfiche WebLink
Fire Station Building Committee <br /> Mntes <br /> October 20, 1997 <br /> r <br /> ARH Enanneer rr : <br /> 'Ile systems HVAC for the Cedarville Fire station was built as designed, and <br /> on schedule. However, it is not known if the system will operate without <br /> incident since it has not been in operation for a full season. <br /> The Fairhaven project is ongoing. There were no negative responses. In the <br /> "own of Wareham,A H Engineering did not coordinate well with municipal <br /> agencies. There were design flaws in the heating system. <br /> Dauhm&3wema.. <br /> Due diligence conducted in the Towns of Harwich,Fitchburg, Carlisle and <br /> New Bedford proved favorable for the architectural firm of Donham& sweeney. <br /> Their ability to work with the building committees,and related experience in the <br /> design of fire stations has been a positive andbute of this firm. <br /> The project architect is prompt, detailed, and well organized. Deadlines and <br /> cost estimates have benrithin.the intended project scope. <br /> &gga mss, �e <br /> It was noted that Fogarty&Associates are used by Donham& Sweeney <br /> for construction estimating and cost control services. <br /> TW Consulting;. <br /> It was noted that an$8 million dollar project is presently ongoing in <br /> Fitchburg that is well coordinated. The Towns of Carlisle and Bedford <br /> stated that the firm was well orchestrated with Donham& Sweeney. <br />