My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/20/1997 FIRE STATION BUILDING COMMITTEE Minutes
>
10/20/1997 FIRE STATION BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 5:13:24 PM
Creation date
4/27/2018 1:56:29 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
FIRE STATION BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/20/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fire Station Building Committee <br /> Mntes <br /> October 20, 1997 <br /> r <br /> ARH Enanneer rr : <br /> 'Ile systems HVAC for the Cedarville Fire station was built as designed, and <br /> on schedule. However, it is not known if the system will operate without <br /> incident since it has not been in operation for a full season. <br /> The Fairhaven project is ongoing. There were no negative responses. In the <br /> "own of Wareham,A H Engineering did not coordinate well with municipal <br /> agencies. There were design flaws in the heating system. <br /> Dauhm&3wema.. <br /> Due diligence conducted in the Towns of Harwich,Fitchburg, Carlisle and <br /> New Bedford proved favorable for the architectural firm of Donham& sweeney. <br /> Their ability to work with the building committees,and related experience in the <br /> design of fire stations has been a positive andbute of this firm. <br /> The project architect is prompt, detailed, and well organized. Deadlines and <br /> cost estimates have benrithin.the intended project scope. <br /> &gga mss, �e <br /> It was noted that Fogarty&Associates are used by Donham& Sweeney <br /> for construction estimating and cost control services. <br /> TW Consulting;. <br /> It was noted that an$8 million dollar project is presently ongoing in <br /> Fitchburg that is well coordinated. The Towns of Carlisle and Bedford <br /> stated that the firm was well orchestrated with Donham& Sweeney. <br />
The URL can be used to link to this page
Your browser does not support the video tag.