Laserfiche WebLink
s <br /> t <br /> Fire Station Building Committee <br /> Minutes <br /> February 25, 2000 <br /> 2. Architect: <br /> Project Meeting Dates: Thursdays— 10:00 a.m. <br /> The Architect requested that the Internet be a requirement for the Clerk of <br /> the Works on-site trailer. Also, Superintendent and General Contractor <br /> (GC to provide address) for transmission to expedite the delivery of <br /> communication. <br /> 3 3. Contractor: <br /> Architect—Coordination drawing to eliminate field problems, and <br /> enhance visualization of procedure. <br /> { <br /> Interview—Clerk of the Works: <br /> The .Fire Station Building Committee interviewed Eugene F. Russo <br /> of the Town of Sandwich for the position of Clerk the Works. <br /> Ir. .uso's resume possesses the necessary education, training and <br /> first-hand experience to perform the duties required ofthe position <br /> in representing the hest interest of the tin. <br /> Most of Mr. . usso's career has involved project management and direct <br /> on-site construction operations. He is fully licensed and certified in the <br /> Meld of construction safety, public fire safety and regulatory affairs. <br /> Mr. Russo indicated that he is available to take on the project. He has <br /> worked with Standen Construction Company in the past and is familiar <br /> with the Wallace Floyd Design Group. <br /> Residing locally, Mr. Russo stated that he will be on-site daily and would <br /> be present on-site during off-hours. Mr. Russo made note of his proficient <br /> public relations background, and construction administration skills. He is <br /> CPR and OSHA trained, and is committed to high standards to ensure <br /> project success. He urged the Committee to review his references. <br /> N <br />