My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/18/2000 FIRE STATION BUILDING COMMITTEE Minutes
>
09/18/2000 FIRE STATION BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 5:12:20 PM
Creation date
4/27/2018 2:42:57 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
FIRE STATION BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
09/18/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
F <br /> itcHIT CTVits LANDSCAP& ARCHITECTURE PLANNING URBAN 1 p-stcN <br /> oyd Design Group 273 SUMMER STREET BOSTON. MASSACIIUSFETTS 01110-Ii,o <br /> I' 17-350.7400 F 97.350-0051 1 www.wallacefloyd.com <br /> 12 September, 2000 <br /> Ms. Joyce Mason <br /> Building Committee Chairperson <br /> Town of iashpe <br /> 16 Great Neck Road North <br /> iashpe , MA 02649 : <br /> Re: Corrections to Fire Station Building Committee Minutes of 31 August 2000 <br /> Dear iris. Mason: <br /> The following corrections are requested in the above noted minutes, Deport of the Architect, page <br /> ? In paragraph 4 Chief Baker's questions regarding stamping of supplementary-documents was <br /> answered to the effect that only the documentation supplied in the course of the Building Permit are <br /> normally required to be stamped l by the engineer unless otherwise required in the contract. In <br /> paragraph 5 my statement was referencing that there are likely to be financial impacts resulting <br /> from the numerous problems encountered with the structural engineering on this project. In <br /> paragraph 6 all my comments were made in the abstract without reference any specific issues on the <br /> Fire Station project, The statement was phrased to indicate that in the case of a demonstrated or <br /> admitted liability the Owner would still have to assume the costs of additional materials required <br /> for the Project but that costs beyond this are normally seen to be the responsibility of the design <br /> professional.To do otherwise would not be appropriate on my part as the assignment of <br /> responsibility and liability must be determined in consultation with the design professionals and <br /> their insurance companies in negotiation with the Committee. <br /> Please amend the meetings notes to reflect these corrections. <br /> Sin , <br /> eo d J. Bertaux AIA <br /> Principal <br /> c: Chris Poole , Poole Professional <br /> Aileen ElCr ckl'ian, I PIC <br /> file <br /> ;1proie tW 9 002.00\04 Communicat iorls\T WN\LET' \l bO 912 00,D 0 C 09112100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.