My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/7/2008 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
7/7/2008 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:25:32 PM
Creation date
5/9/2018 2:28:05 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
07/07/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> � f Action <br /> Parties:Joyce Mason,Mashpee Town Manager(JM),Dene Read,Meshpee Asst Town Manager(RR),Steve Cook,Committee Chair(SC),Catherine Laurent,DPW(CL),Helene Defoe,Library(11D),Stewa <br /> Civil/Site( D),Landscape(KO),Mashpee Commons(MC) <br /> XNo <br /> . :: <br /> i { <br /> :D <br /> .. <br /> 513108.JSR will provide Grp to dal <br /> board to identify proposed C0101 <br /> I Shingle color 06/63/08 J 06111/ 8 tri <br /> F m, soffits, etc. 1t is agreed tfrai <br /> the material submittals have be( <br /> agreed that MC w#11 be included <br /> 1 D h "c*ed t idetail 9 s Dye r <br /> +'reveaaGGGIIIl111[] 964"In'1 06434110 appfemimately 20 years with <br /> Cast stone masonry color and uniformity assurance. 66163108 JSR 06111108 513108 see comments in Item#1 <br /> Window color 06103!08 ,SSR 06111108 613108 See comments in Item# <br /> Masonry applications will promote <br /> 5 Dimensional Interface between window and ext wall. 6! 81 11�� traditional and almost flush with sig <br /> when full sized drawings are reg <br /> for fLP response. <br /> Detail extent f use of Hardllanl' and PVC trim on South elevation 06103108 M /11108 F eview plans. 613198- will rel <br /> p received. 6119198-Information <br /> Windows and trim. Review dans. <br /> 7 Describe materials used at after hours entry 06103108 mc 06111108 drawings are received. 6119158 <br /> response. <br /> 3 1 Color and material of roof brackets 06103108 JSR 06111108 613108 See comments in Item# <br /> Light shelf may not be included. Pi <br /> More detail of metal tight shelf is required, color, connection, dimensions 06103108 Mc 06111163 review detail when full sized dra <br /> seat. Waitinm for M LP res orrsi <br /> Will be included in next set of grog <br /> 10 Lamer scale profiles precast stone headers, precast sills, column capitals. 08103108 MG 06111108 when full sized drawings are re <br /> for MCLP res onse. <br /> More detail of the interface between eaves overhang and the cedar Plans show a 1 PVC trim at they <br /> 11 shingles. Will this be trimmed out or ended with shingles? 06103108 M 06/11/08 review detail when full sized dra <br /> 12 What is the color of the soffit at the eaves' 06103108 JSR 06111108 613108 see comments in Item# <br /> Pomrov Associates <br /> Most Decent Report 7!712008 12:41 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.