								       	M  shp  a Pubic Library   PCO/Channe.Order Log - 12/31109
<br />   				DESCRIPTION I IPTION   		Issue       				Reason For Grange      				Original      Final      Change 		Current
<br />     								Date 												Value       Value       Class
<br />    	PC01  Electric primary installation originally by MCLP	12/23/08     		MCLP was originatly to install and ML to share in 50/50 cost.    		$33,023.60  623,588.00   Scope			r
<br />    	PC02 Curbing along Steeple Street and in entrance drive.    212/09       	Scheduled to be corp pleted by NiCLP.Put pricing together to hel p them out.       	13,153.00 	0.00     n/a       	No respons
<br />    	CE#1  Structural Steel Modifications       		2/18109       	Elements of structural steel which did not get incorporated in final design.		11,904.00    11,904.00   Design    		Appr
<br />    	PCO3 Elevator Vent Modifications			4/16109     	Credit:Reduced height of structure which changes framin   ropper oladdin 		-880.00    -1,080.00   Design    		Appr
<br />    	FC04 Roof Flashing    				4116/09     	Exploring'the option to upqrade the roofing flashin s from aluminum to copper.       	4,903,50     5,477.00  Upgrade       		r
<br />    	P005 Recessed TV Cabinet     			4/29109  	Provide a recessed area in the millwork to accommodate a new informational screen.		0.00	0.00  Upgrade      	Approved,
<br />    	PCO6 Asphalt Shingles Revision  			4129109    		Upgrade roofing system to accommodate 120 Mph wind rating.      		8,758.79    10,902.00   Design    		Appr
<br />    	PC07 Window Treatment Revisions       		5/12109 		Credit:Eliminate North facing window shades,Add 2 on South face.  		-2,500.00      -700.00   Design       	Approved,
<br />    	PCMB HVAC Revision rlsion   				5118108 			Added HVAC supply at BuildingRoom oom 113   			1,180.00     1,180.00   Design    		Appr
<br />    	PQ09 Elevator Electrical Revisions       		5113/09  	Credit.Changes to the main distribution panel clue to reduced elevator requirements.     	-955.00     -955.08   Design    		Appr
<br />    	PC010 Site Lighting Revisions    			5119/09	Credit:Reduce number of side walk poles on Steeple and change type at entrance drive. 	-3,049.00    -3,049.00   Design    		Appr
<br />    	PC01 I PV Mountie       				5/27109			Upgrades required to tie PV supports to roof structure. 			15,000.00    12,224.00   Design    		Appi
<br />    	PC 12 Door Hardware€evisions  			5/27/09    	Costs associated with providing(3)additional doors with security access control.  		0.00     5,367.00   Dell n    		Appi
<br />      	E#8 CAD design time incurred by HVAC sub.     	5/18109		Time invested by HVAC sub-contractor to coordinate ductwork for G G D.  		3,061.00     3,081.00   Design'      	Approved,
<br />    	P O13 Revisions to ceiling design in Children's Area 	6/24109	Credit,JFK recommended simplifying the ceiling system after seeing the product submittals.     	0.00    -3,800.00   Desig n      	Approved,.
<br />    	PCO 14 Provide back-flow preventer for boilers.       	7{7/09					Required by code. 					2,638.07     2,445.00   Design       	Approved,
<br />    	PCO 15 Electrical floor box revisions in Young Adult Froom     7/8/09 			Credit:revisions as a result of furnishings meetings.   			-208.51      -209.00   Design       	Approved,
<br />    	CE#15 Lower openings at 2nd floor windows 		717/09   	Mis-communication between the Arch and GC that was not documented with an RFI    	2,274.00     2,274.00   Design       	A  roved,
<br />    	PDO 16 Door 111 Access Control   			815109    		Cost associated with providing correct infrastructure at Door 111       		500.00	0.00   Design       	Approved,
<br />    	PCO 17 PV Inverters Disconnects  			8110/09   	N S TA R req uires extertar disconnect switches located next to meter for each inverter    	1,788.00     1,788,00   Design		Approve
<br />    	PCO 18 Induction units at 202&207			8/18109 	—Splitting one unit into two will allow ceiling heights tc remain as shown in drawings     	97238.00	0,00   Design    		Re'r
<br />     	E#21 Added baby changing station       		6/10/09     	Plans call for"By Ownee'.Asked G 0 for price to/Cee p consistent with other(2)_.		285.00      285.00   Scope       	AnDroy d,
<br />    	CE##22 Disconnect switches at chiller       		9116/09    Specified chiller was submitted with single point connection,chiller on site has two point connection      1,000.00	0.00    GC      		Rejo
<br />     	E x#23 1 Relocation of FA Cabinet,pulI station,&strobe	8/12109			Needed to be done to dear the donor walls ace.T&cul   			500.00      574.0   U  rade		Approve
<br />    	PCO 19 Provide  irin for hand driers in bathrooms.   	810/09      		Requested b Town to    rade from hand towels to driers.       		'k,500,00     4.568.00      rade   		.ova
<br />		PomroY Assooiates-Most Recent Report 12-31-09