| 
								        	HVAC-  split  system  DX  cooling-  sage  $122 , 000
<br /> 			or  total  air  conditioned-  acid  $440 , 000 .
<br />	-
<br />     	indirect  fired  gas  furnace  for  gym  save  $9 , 200 .
<br />	Site  Development
<br />	--  reduce  student  parking  by  90-  save  $73 , 800 .
<br />     	reduce  faculty  b    100-  save  $82 , 0000,
<br /> 	-  tennis  courts  -  reduce  by  4  save  $112 , 000 .
<br />     					reduce  by  6  save  $168 , 0000
<br /> 	-  delete  practice  football  field  -  save  $64 , 900 .
<br /> 	--  delete  bleachers  -  save  $67 , 200 .
<br /> 	-  delete  entire  football  area,   fl.eld,   track,   bleachers  save  -  $342 , 000t
<br /> 	--  delete  l  baseball ,   1  softball ,   2  soccer  save  $296 , 0000
<br /> 	-  sing_le  entry  road-  save  $33 , 500 .
<br /> 	-  delete  irr igati.on  system.      save  $112200001
<br /> 	-  reduce  landscaping  by  1/3  --  save  $56 , 00001
<br />    						by    /3  save  $112 , 000 .
<br /> 	-  reduce  pav i rig  and  walks  by  1/5    saire  $251 , 3000
<br />    								1/2    save  $628 , 2006,
<br /> 	-  feature  drive  single  lane-  save  $33 , 500 .
<br />     	reduce  clear  and  grub  area    save    33 , 000
<br />												.
<br /> 	-  change  material  of  s tormwate r  piping-  save  $19 , 300 ,
<br /> 	-  change  curbing  to  precast-  save  $117 , 600 .
<br /> 	-  reduce  size  of  parking  stalls    -  save  $84 , 000 .
<br />     	delete      flagpoles  -  save    8 , 400 ,
<br /> 	-  combine  fire  and  domestic  water--  save  $13,4000 ,
<br /> 	-  rod uC e  paving  th i s ktie s s--  save  $92 , 0004
<br /> 	--  eliminate  parking  lot  islands  ---  sage  $50 , 000 .
<br /> 	---  develop  drop  off  closer  to  school  at  no .   e  st  �o��n�r�-  sa�f�    � , 000 ,
<br /> 	-  rediae  on  site  materials  for  fill  and  subdrade  --  save  $80 , 000
<br /> 	-  cast  in  place  concrete  not  pavers      save  $48 , 000
<br /> 	-  create  busd.rop  off  at  fields-  add  $4 , 500 1
<br /> 	-  create  separate  student  drop  off  area  -  add  $3 , 000V
<br /> 	--  install  turning  lanes  at  entrances  -  -add  $28 , 000
<br /> 	-  school  proximity  signs  -  Add  $1 , 000 .
<br /> 	-  create  rotary  at  major  interchange  and  main  access--  save  $80 , 000  ( from
<br />     	cost  of  signal ) .  Torn  FLida.la  does  not  think  it  would  work  wl' thout  land
<br />     	aoquisitio   *
<br />     	locate  track  and  football  field  to  NE  corner  --  save  $18 , 0000
<br /> 	-  restrict  traffic  as  SE  corner  of  the  campus-  save  $3 , 000 .
<br /> 	-  delete  hallf.iel.d  lighting-  save  $151 , 2000
<br /> 	-  metal  halide  lighting  -  a.dd.  $11 , 200
<br /> 	Planning  and  Programming
<br />     	delete  auxiliary  gym  -  save  $350 ; 000
<br />     	delete  home  arts  suite-  save  $50 , 000
<br /> 	--  delete  athletic  directors  office-  save  $20 , 000
<br />  	W
<br />     	delete  multi  experience  lab  -  save  $110 , 000
<br /> 	�-
<br />     	building  footprint      save  $300-400a000 ,
<br /> 	Shannon  Scarlett  also  had  some  stig gest ions .     Moving  the  circulation  system
<br /> 	away  from  the  s e ry  ry  and  get  it  to  the  other  side  of  the  dining  facility
<br />  	for  access  to  the  germ.
<br /> 	Locate  lei.stire  services  office  off  the  main  lobby,  use  as  a  secondary
<br /> 	reception  area ;
<br />  	secur..ity  prohl ein  with  the  egress  off  of  the  main  entry  vestibule .   Ray
<br />
								 |