My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/14/1995 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
2/14/1995 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2018 5:04:05 PM
Creation date
8/20/2018 1:04:04 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
02/14/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
aul justid he spoke with Tom Cahir . He is not sure the legislature will <br /> ct on that this budgetary cycle . He is also having a real problem trying <br /> o et 75% reimbursement for Mashpee . He does not think Mash+pee will get <br /> ny relief on the reimbursement per sq foot. Paul has a 1 etter from the <br /> tate saying they have accepted the project dated Noy1994 <br /> . That date <br /> oeks the project into a reimbursement rate * <br /> eter said in politics nothing is locked in . If the state raised it to <br /> 163 er sq foot in the next month or so, and Mashpee is allowed that rate <br /> t would bring the � up <br /> budget 2 million . The town is only responsible <br /> or 42 of <br /> it. The committee could ask that from town meeting <br /> when the budget was put together we did not budget for <br /> eter said it seems wh <br /> he site as much as we needed . <br /> au 1 agreed , they estimated $6 per sq foot, whish is $10 off . The STP was <br /> of even calculated i n . <br /> teve said the er i g i na <br /> 1 calculation figured 6 . 5 for inflation and that i s <br /> here we are now . The difference is in the design . <br /> au <br /> 1 asked Steve what he would out from the design? <br /> ' <br /> au 1 said the Committee has to make a decision } ask SMMA to re-design or <br />- ree on cuts/alternates or go back to town meeting . <br /> tee said the second page ( alternates ) is unpalatable to him, <br /> oe would like to see some re-design . <br />}au 1 said d re�de s� �n will cost the project because a 6-8 month delay with 6 <br /> nf 1 ation ratethe Jost f 4 of 1 at i on will sat up any savings from r e�- <br /> des i gn . wait ( past . <br /> an feels the p ro 'eet will hit a bad bidding period i f you <br /> iaroh ) + <br /> 1 1 1 thinks the om a i ttee should seriously look at the gym, it i s only a <br /> gar ai n ' f you can afford i t. <br />)oe is suggesting cu <br /> tti n some of the angles , curves , not re--designing the <br /> 1.nt i re building . <br />)anise would like to hear from Ian, who represents the committee * <br />:an said he would avoid a re-design , The Committee grade a geed des i sl <br /> on to <br />)ick th <br /> at design . The architects have not worked harp] enough to meet that <br /> es n . He would cut the gym first. <br /> ' <br /> rete r said he does not want the long term quality of the project , which is <br /> in important part of our oommun i t}' to suffer because a decision may be <br /> A n oomfo r <br /> table in the short term. He suggested presenting to the voters a. <br /> ' use iters are alternates , the primary task it a <br />..hol oe. The oommun t <br /> to the site than to add a building addition . <br /> u� 1di ng . It is easier to add <br /> ' sent the town with a balanced budget, if we cut the <br /> F he omni l t tee can p r e <br /> D m, and then tell town me etin <br /> g <br /> what has been out . If they want in back in <br /> a for i t - with additional funds . Let the town decide " <br /> they have to p <br /> assuming there would be cuts to make , There <br />�terr due game to the meeting � <br /> are a lot of finishes she could 1 i ire without . As much as she be 1 i eves i n <br /> the athletic fay i l i t i es , the building is first . The committee could go to <br /> Lown <br /> meeti n and sa we can build i 1 d a building i 1 d i ng but not outdoor fae i 1 1 <br /> ties <br /> because of i of 1 at ion . <br /> Peter said his concern is the Committee makes all of these cuts and the <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.