My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/5/1995 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
12/5/1995 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2018 5:12:57 PM
Creation date
8/20/2018 1:49:48 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/05/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Paul said the proposal was based on the number of hours necessary to do the <br /> job . The inspection firm would want someone full time while the roof was <br /> being installed. <br /> Peter said some of the criticism at the Selectmen' s meeting asked why pay <br /> $40 , 000 to an inspector to remove some of the responsibility from the <br /> architects . <br /> Joel said the inspector could 'improve general compliance into something <br /> more; <br /> Peter said the dollar value of the contract related to the number of hours <br /> the .inspector would be there was about $Soo . per day. <br /> Paul said using Stone ' s schedule they developed a workable formulae <br /> Now that work has begun, we may be able to reassess the amount of time <br /> necessary <br /> Tom said the adhesive was not warmed before 'installation on the first <br /> F <br /> sectio. installed* <br /> Peter asked if this would have occurred with an 'inspector? <br /> Paul said roofs , unfortunately, are covered after installation, so you <br /> cannot see if it was instal.l,ed correctly unless someone is present t <br /> Peter said paying for an 'inspector will not buy a. guarantee , should we <br /> spend more for an extended warranty", <br /> Paul said we have a to year warranty. With a warranty you end up spend <br /> time fighting about how the roof was damaged, and in the meantime the roof <br /> is leaking. Manufactorers don't like to pay out money. <br /> Dr. DeMours said when they replaced then entire Middle School roof they <br /> hared and inspector, for about $35 , 000 . <br /> Steve said he thought the masonry work would be tented? <br /> Joel said the temperature is getting close to require tenting it is <br /> marginal. . Mone has sent 3 notifications to the mason} <br /> Alan Scott told the Committee on December 20th at 12 : 00 there will be a, <br /> Christmas buffet at the site and everyone is invited* <br /> CHANGE ORDERS <br /> Paul made a motion to forward to the Selectmen for their <br /> approval a change order for $1 , 834 . 00 for <br /> - add conduit stub for future athletic lighting <br /> -- a.dd additional clearing for relocating excess loam pile <br /> add floor drain in laundry room <br /> - credit to use reclaimed paving material <br /> Merry Sue seconded the motion. All members were in favor 6-0** <br /> ,noel explained prices for the additional fields is still outstanding <br /> because SIGMA re-issued the drawings in an attempt to reduce the scope of <br /> work. Stone is in the process of pricing 1t and it is nearly done. <br /> Paul said he did some pricing checks on the unit prices in the first round <br /> of proposals and they were of f by a mile. He wants Stone to know that we <br /> are going to do due diligence on this . <br /> Alan Scott said if we cannot come to terms with a lump sum there are ether <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.