Laserfiche WebLink
7 <br /> Board of Selectmen <br /> Minutes <br /> March 1 , Zoo <br /> Public Hearing.—Solid Waste Collection Options: (continued) <br /> Mr. Marcelli stated the total cost to the town for the status quo is$1.3 <br /> million,the total cost to the ton for the PAYT is $1.7-million and the <br /> curbside collection is over$2 million. Mr. Marcelli indicated that status <br /> quo i <br />