My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/23/2011 BOARD OF SELECTMEN Minutes
>
5/23/2011 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2018 5:16:01 PM
Creation date
8/31/2018 11:24:21 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
05/23/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 <br /> Board of Selectmen <br /> Minutes <br /> May 2 , 2011 <br /> l eauest to Ire igningr4a p ec : <br /> Charles Mainta is, Assistant inspector of Buildings was in attendance to request <br /> the Selectmen approve the hiring of a Temporary Building Inspector on a part-time <br /> basis to provide assistance to his department during the absence of the Building <br /> Inspector and in his forthcoming absence due to medical reasons. Funds exist in <br /> the departmental budget to support the position request. Upon the return of IVB. <br /> Maintanis,the vacant position of Building 1ispector is anticipated to be filled, <br /> /Motion made by Selectman Cahlane to approve the request of the Building <br /> Department to employ a Temporary Inspector as referenced. <br /> Motion seconded by Selectman O'Hara. <br /> VOTE: Unanimous. 5-0. <br /> Roll Call Vote: <br /> Selectman Taylor,yes Selectman Richardson,yes <br /> Selectman Sherman,yes Selectman Cahalane,yes <br /> Selectman O'Hara,yes opposed,none <br /> Recgmnwndatiq.n for Bid AccepjMce—Capital Needs—Roof Re lacement <br /> .e ' Projects: <br /> Three.bids were received for the replacement and/or repair of the roofs at the Town <br /> Hall(membrane),KC Coombs School(shingle and membrane), and Quashnet <br /> School (membrane). Upon review, it is the recommendation of the I'la�nning <br /> Construction Committee that a contract be awarded to Corolla Contracting, Inc. of <br /> Winthrop,MA for a total bid award of$583,800.. The recommendation includes. <br /> acceptance of both Bid and Alternate 1. The Bid Alternate I is a deduction of <br /> $105,000 for shingling over the existing asphalt sbingles at the KC Coombs <br /> School. <br /> Motion made by Selectman Cahalane to award the bid received from Corolla <br /> Contracting,Inc,for the Roof Replacement& Repair Projects as <br /> recommended. <br /> Motion seconded by Selectman Sherman. <br /> VOTE: Unaimimous. 5-0. <br /> Roil Call'dote; <br /> Selectman Valor,yes Selectman Richardson,yes <br /> Selectman Sherman,yes Selectman Cahalane yes <br /> Selectman.O'Hara,yes opposed,none <br />
The URL can be used to link to this page
Your browser does not support the video tag.