My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/27/2018 PLANNING BOARD Minutes
>
9/27/2018 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 5:01:00 PM
Creation date
12/7/2018 9:58:22 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
09/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the legal issue of removing the original Article may be a bigger concern and suggested the possibility <br /> of scheduling a Public Hearing before Town Meeting. There was no additional public comment. <br /> Warrant Article 16: Raze and Replace-The Chair read the Public Hearing Notice for Article <br /> 16. The Chair reported that the Board was in receipt of a letter from Attorney Kevin Kirrane in <br /> support of Article 16, noting a change in the interpretation of the existing Bylaw. The Chair read <br /> portions of Mr. Kirrane's letter. Comments were also received from Mr. Fudala and the Chair <br /> provided copies of the May 2`1 Planning Board minutes when Raze and Replace was first discussed <br /> with the Planning Board. The Chair also referenced correspondence dated August 27, 2018 between <br /> the Planning Board Chair and the ZBA, requesting that they address the concerns discussed about Raze <br /> and Replace. Though not included in packets, Mr. Lehrer reported that the ZBA decisions requested <br /> by the Chair were available for review at this evening's meeting. There was no additional written <br /> correspondence received, including from Town Counsel, <br /> The Chair confirmed that she had asked that ZBA decisions be provided to the Planning Board to <br /> better understand what had been approved in the past. The ZBA provided decisions for 118 Waterway, <br /> 18 Shorewood Drive and 5 Cantor. Although requested, plans for the decisions were not available. <br /> Mr. Balzarini inquired why the Board would consider the plans and the Chair responded that the ZBA <br /> stated that they had done them for years and she had requested that they provide examples. Mr. <br /> Balzarini stated that he had shown Mr. Lehrer the area. The Chair invited public comment. Comment <br /> needed to be placed on hold to open the next Public Hearing. <br /> MOTION: Mr.Balzarini made a motion to continue the Public Hearing for Ockway Highlands <br /> Subdivision until 8:00 p.m. Mr.Weeden seconded the motion. All voted unanimously. <br /> 8:00 P.M. Ockway Highlands Subdivision,Discussion and Possible Action to Modify or <br /> Revoke Approval <br /> The Chair stated that there were two public hearings for Ockway Highlands. The appointed time <br /> having arrived, the Chair opened the Public Hearing for Ockway Highlands Subdivision and read for <br /> the record the Public Hearing Notice. Another Public Hearing would also be opened to review the <br /> Special Permit and the Chair stated that all comments from this Public Hearing would be rolled into <br /> the next Public Hearing. <br /> The Chair referenced the Special Permit Decision, as well as an inspection report, drafted by Mr. <br /> Rowley, dated September 25, 2018. Mr. Rowley summarized that the project had been going on for <br /> some time, with several inspections occurring over the last year regarding clearing along Blue Castle, <br /> Great Neck Road South and construction at Carriage Drive, including the need to address run off <br /> issues with hay bales. Mr. Rowley stated that a contractor had been hired to complete basic <br /> construction on drainage systems at Blue Castle Drive and Carriage Drive but construction ceased. <br /> Following the efforts of Mr. Virgilio, resident of Blue Castle Drive, to encourage the completion of the <br /> drainage work, additional work occurred at the intersection of Blue Castle Drive and Great Neck Road <br /> South. Mr. Rowley submitted photographs of the work, noting that it was still not complete and that <br /> the binder was placed on the road, a rolled berm on Great Neck Road South and hydro seed was <br /> necessary and there was evidence that there was some transfer of material within the drainage area that <br /> could impact the subsurface drainage systems. In addition, on Carriage Drive,Mr. Rowley expressed <br /> concern about the condition of that sub surface system. Mr. Rowley stated that activity was necessary <br /> in order to correct the situation by finishing the construction at Blue Castle Drive and Great Neck Road <br /> South. Regarding Carriage Drive,Mr. Rowley cautioned against loam and seed until the drainage <br /> system could be inspected, as with the Blue Castle drainage system. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.