My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/15/2011 SEWER COMMISSION Minutes
>
11/15/2011 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 9:26:21 AM
Creation date
1/2/2019 1:37:27 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
11/15/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town of Mashpee <br /> Capital Improvement Program FY 2012 Project Request Form <br /> (Please Type All Responses) <br /> Date 11-29-10 <br /> Project No. 2 <br /> 1. Project or Equipment(Short Title) Sewer System Development <br /> 2. Description and Purpose of Project or Equipment: <br /> Development of municipal sewer system, including wastewater treatment plants, sewage pipes,pump <br /> stations and effluent discharge areas. Alternatives currently under study include expansion on certain <br /> existing private sewer systems and development of entirely new municipal facilities. Sewering is required <br /> to meet DEP/EPA nitrogen targets in Popponesset and Waquoit Bay mandated by the federal Clean Water <br /> Act as well as reduction of phosphorous loads to freshwater ponds. <br /> Estimate Life of Projector Equipment 50+ Years <br /> 4. Status of Project or Equipment <br /> Site Secured x Not Secured Not Required <br /> Survey of Need Under Study x Completed Not Required <br /> Preliminary Plans/Specs x Under Study Completed Not Required <br /> Final Plans or Specs Under Study Completed Not Required <br /> 5. Priority 6. Cost Estimates <br /> Urgent x Preliminary Final <br /> Necessary x <br /> Desirable Land Costs unknown <br /> Construction Cost $401,544,000 <br /> Other Cost $4,056,000 design <br /> Total Cost $405,600,000+land <br /> 7. Effect on Actual Operating Budget 8. Source of Funds <br /> Operational (+)(-) $unknown Current Revenue $ unknown <br /> Maintenance(+) (-) $unknown Bond Issue $unknown Years <br /> Total(+) (-) $ unknown Short Term Note $ Years <br /> Revenue from Project $unknown /yr Other(describe) Betterments,DRI mitigation fees, <br /> New Personnel Required $unknown System development charges, connection fees, SRF Loans <br /> 9. Year Proposed for Construction or Acquisition FY 2014+ <br /> 10. Comments and Justification (Please attach a sheet describing need in detail include the cost of not <br /> completing this project)r r <br /> 11. Signature --, <br /> gn �C . �2�� L---Title Chairman, Sewer Commission <br />
The URL can be used to link to this page
Your browser does not support the video tag.