Massachusetts Estuary Project(MEP)
<br /> --._.._.------._._---_Linked Watershed EmbaynentModel Peer Review
<br /> 8. BIBLIOGRAPHY
<br /> Band, L.,K. Campbell,R.Kinerson,K. Reckhow and C. Welty. 2005. Review of the Chesapeake
<br /> Bay Watershed Modeling Effort. STAG Publication 05-004, Chesapeake Research
<br /> Consortium,Inc.,Edgewater,MD.
<br /> Band, L.,T.Dillaha, C. Duffy,l{.Reckhow and C.Welty. 2008. Chesapeake Bay Watershed Model
<br /> Phase Five Review. STAC Publication 08-003,Chesapeake Research Consortium,Inc.,
<br /> Edgewater,MD.
<br /> Biber,P.D., C.L. Gallegos, and W.J. Kenworthy. 2008. Calibration of a bio-optical model in the
<br /> North River,North Carolina (Albemarle-Pamlico Sound): A tool to evaluate water quality
<br /> impacts on seagrasses,Estuaries and Coasts, 31(1): 177-191.
<br /> Cape Cod Conunission. 2009. Solving wastewater management challenges for non-point source
<br /> nitrogen control in coastal watersheds.EPA Water Quality Cooperator Grant CP-97134401-
<br /> 0.Water Resources Program, Cape Cod Commission,Barnstable,MA. 167 p.
<br /> Carr,.J.,P. D'Odorico,K.McGlathery,and P. Wiberg. 2010. Stability and bistability of seagrass
<br /> ecosystems in shallow coastal lagoons: Role of feedbacks with sediment resuspension and
<br /> light attenuation,Journal of Geophysical Research, 115: G03011,
<br /> (doi:10.1029/2009JG001 103).
<br /> Chapra, S.C. 2003.Engineering water quality models and TMDLs.Journal of TVater Resources
<br /> Planning and Management. 129(4): 247-256. July/August.
<br /> Chesapeake Bay Scientific Technical Advisory Committee. 2011. Evaluation of the Effectiveness of
<br /> SAV Restoration Approaches in the Chesapeake Bay. STAC Publication 11-03. 31pp.
<br /> Costello, C,Kenworthy,W.J. 2011. Twelve-year mapping and change analysis of eelgrass(Zostera
<br /> marina) areal abundance in Massachusetts(USA)identifies Statewide Declines. Estuaries
<br /> and Coasts. 34:232-242.
<br /> Conmzonwealth of Massachusetts. 2006.Final Great, Green and Bournes Pond Embayment Systems,
<br /> Total Maximum Daily Loads For Total Nitrogen(Report#96-TMDL-6 Control#181.0)
<br /> Bureau of Resource Protection,Massachusetts Department of Environmental Protection,
<br /> Executive Office of Energy and Environmental Affairs, Commonwealth of Massachusetts.
<br /> April 6, 2006. _
<br /> Commonwealth of Massachusetts. 2007.Final Pleasant Bay System,Total Maximum Daily Loads
<br /> For Total Nitrogen(Report#96-TMDL-12,Control 4244.0). Bureau of Resource Protection,
<br /> Massachusetts Department of Environmental Protection,Executive Office of Energy and
<br /> Environmental Affairs, Commonwealth of Massachusetts. May 2007.
<br /> Denu ren A.O. and W.Rodi. 1986. Calculation of flow and pollutant dispersion in meandering
<br /> channels,Journal offluid Mechanics, 172: 63-92.
<br /> Dennison,W.C.,R.J. Orth,K.A. Moore,J.C. Stevenson,V. Carter, S. Kollar,P.W.Bergstrom, and
<br /> R.A.Batiuk. 1993. Assessing water quality with submersed aquatic vegetation,BioScience,
<br /> 43(2): 86-94.
<br /> �� �� December30,2011
<br />
|