My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/16/2012 SEWER COMMISSION Minutes
>
2/16/2012 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 12:35:16 PM
Creation date
1/2/2019 1:37:57 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
02/16/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ENVIRONMENTAL REVIEW OF A NEEDS ASSESSMENT REPORT WILL FOLLOW,AS DETAILED <br /> IN PHASE II <br /> B. ENGINEER shall prepare an Alternative Screening Analysis Report as described below: <br /> Combine appropriate portions of Phase III, IV, and VII C and G. <br /> • Prepare the report in accordance with DEP.wastewater planning guidance documents. <br /> • Attend a regulatory review meeting with DEP, CCC,CMAST CZM and DMF to review findings of the <br /> report. <br /> • Attend a MEPA and/or CCC public hearing for this phase. <br /> • Print and distribute up to 45 copies of the report. <br /> C. ENGINEER shall prepare a Recommended Plan/Draft Environmental Impact Report(DEIR)as described <br /> below:, <br /> • Utilize the approved Recommended Plan as accepted by COMMISSION in Phase VI along with <br /> necessary environmental impact information to produce the DEIR. <br /> • Attend a regulatory review meeting with DEP, CCC, CMAST CZM and DMF to review findings of the <br /> report. <br /> • Attend a MEPA and/or CCC public hearing for this phase. <br /> • Print and distribute up to 45 copies of the report. <br /> D. ENGINEER shall prepare a Recommended Plan/Final Environmental Impact Report(FEIR) as described <br /> below: <br /> • Utilize the DEIR and respond to regulatory comments. <br /> • Attend a regulatory review meeting with DEP, CCC, CMAST CZM,and DMF to review findings of the <br /> report. <br /> • Attend a MEPA and/or 000 public hearing for this.phase: <br /> • Print and distribute up to 45 copies of the report. <br /> Phase IX Public Participation Outreach. <br /> A. ENGINEER shall perform the following Public Participation Outreach: <br /> • Present project updates at two public meetings during the duration of the project. <br /> • Present each phase of the project at COMMISSION Meetings as described in earlier phases of the project <br /> scope. <br /> • Work with the COMMISSION to coordinate and develop agendas for the meetings. <br /> • Develop a project mailing list of interested Town groups, individuals, and media outlets that will be <br /> notified before each meeting. If desired by the COMMISSION, ENGINEER will send out the notices. <br /> The notices will also be used to solicit public input: <br /> • Prepare four brochures during the project, and print 2000 copies of each for delivery to the <br /> COMMISSION. Brochures will be on one double-sided I I"x 17"page. <br /> • Appear on one cable TV appearance and produce one video with the production system of the Cape Cod <br /> Technical High School to be made available to public access TV, schools, the library, and community <br /> groups. <br /> • Prepare two movable displays. <br /> • Develop a Town Meeting campaign to identify key Town Meeting voters and to get needed project <br /> information to these key voters. <br /> Phase X Project Administration. <br /> A. Provide written monthly progress reports which will include: <br /> • Those items required by Section 7.2 of the Agreement: <br /> - t0 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.