Laserfiche WebLink
Table 3-A Option 1 C-Summary of Recharges (from Table 3) <br /> Est.Average <br /> Annual Future <br /> Flow(g -d, <br /> Planning Area Locations rounded) <br /> WWTF recharge within Popponesset Site 6(Keeter); South Cape Village; Site 4 1,030,000 <br /> Bay Watershed (Transfer Station);Willowbend and golf <br /> course;Windchime Point;Strafford Ponds; <br /> Cotuit Meadows;Wampanoag Village; <br /> Pirates Cove;Santuit Pond Cluster, <br /> WWTF recharge within Waquoit Bay Back Road;Site 6(Keeter) 480,000 <br /> East Watershed <br /> Septic/I/A recharge in planning area Various 500,000 <br /> Recharge outside watershed Site 6(Keeter); New Seabury; Barnstable; 690,000 <br /> Sandwich;Falmouth <br /> Totals(rounded) 2,700,000 <br /> G:\86\12001\Co RespondencelMemos12011\Scenarios Descriptim-Updated\Scenados(IA-3A)2012.docx 9 <br />