Laserfiche WebLink
University of Massachusetts Dartmouth <br /> School of Marine Science and Technology <br /> Coastal Systems Group <br /> 706 South Rodney French Blvd, r' <br /> New Bedford,MA 02744-1221 <br /> ************************Technical Memorandum******** * *******£******** <br /> To: Tom Fudala,Chair,Mashpee Sewer Commission <br /> From:Brian Howes,Director Coastal Systems Program <br /> Ed Eichner,Coastal Systems Program <br /> Roland Samimy,Coastal Systems Program <br /> Sean Kelley,Applied Coastal Research&Engineering,Inc. <br /> RE: Scenarios Results for Popponesset Bay and Waquoit Bay based on MEP Linked <br /> Models <br /> Date: November 15,2012(revised) <br /> This Technical Memorandum details the results of Scenario Runs completed for the Mashpee Sewer <br /> Commission using the Massachusetts Estuaries Project(MEP)Linked Watershed-Embayment Models <br /> developed for Popponesset Bay and Waquoit Bay estuary systems(Figure 1). Development of the MEP <br /> models and establishment of the nitrogen threshold for these systems are described in the respective <br /> MassDEP(SMAST MEP Nitrogen Threshold Reports.L' These MEP reports indicate that both estuary <br /> systems are showing impaired habitat quality resulting from nitrogen enrichment. The Massachusetts <br /> Department of Environmental Protection(MassDEP)has formally acknowledged these assessments and <br /> has obtained nitrogen Total Maximum Daily Loads(TMDLs)from USEPA for both Popponesset Bay <br /> and Eastern Waquoit Bay. <br /> The Scenarios Runs in this memorandum are the latest round of scenarios completed for the Town of <br /> Mashpee,the most of recent of which was six scenarios,involving I I model runs between the two estuary <br /> systems, completed in 2009 that explored various wastewater treatment and discharge location <br /> alternatives.s The scenarios in this current Technical Memorandum are refinements of the 2009 <br /> scenarios with updated wastewater collection,treatment,and discharge options. <br /> Howes,B.,Kelley,S.,Ramsey,J.,Samimy,R.,Eichner,E.,Schlezinger,D,and Wood,1.2004.Linked Watershed-Embayment <br /> Model to Determine Critical Nitrogen Loading Thresholds for Popponesset Bay,Mashpee and Barnstable,Massachusetts. <br /> Commonwealth of Massachusetts,Department of Environmental Protection,Massachusetts Estuaries Project,138 pp. <br /> z Howes B„S.Kelley,E,Eichner,R.Samimy,J.S.Ramsey,D.Schlezinger,P.Detjens(2011).Massachusetts Estuaries Project <br /> Linked Watershed-Embayment Approach to Determine Critical Nitrogen Loading Thresholds for the Waquoit Bay and Eel Pond <br /> Embayment System,Towns of Falmouth and Mashpee,MA,Massachusetts Department of Environmental Protection,Boston, <br /> MA.234 pp. <br /> s Eichner,E„B,Howes,S.Kelley,and J.Ramsey.December 15,2009,MEP Technical Memo to Tom Fudala,Chair,Mashpee <br /> Sewer Commission regarding Report on Unified Database and Requested MEP Scenarios for the;(a)Popponesset Bay Estuary <br /> and(b)Eastern Basins of the Waquoit Bay System. <br /> 4 Eichner,E.,8,Howes,S.Kelley,and J.Ramsey.February 9,2010,MEP Technical Memo to Pit,Lombardo,Lombardo Associates <br /> and Tom Fudala,Chair,Mashpee Sewer Commission regarding Report on Revised Scenario 3 for Eastern Basins of the Waquoit <br /> Bay System. <br />