My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/17/2013 SEWER COMMISSION Minutes
>
1/17/2013 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2020 2:18:23 PM
Creation date
1/2/2019 1:40:14 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
01/17/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Among the I I sites where the bulk of the study area wastewater flow is discharged are: Willowbend, <br /> Keeter,Transfer Station,and Back Roads. The Keeler site,which receives 0.34 MGD,is located in the <br /> Rock Landing subwatershed,but borders on the Ockway Bay and Great River subwatersheds. After <br /> discussing this with GHD staff,it was decided to assign 50%of the load to Rock Landing,and 25%each <br /> to Ockway Bay and Great River. Similarly,project and GHD staff discussed and assigned the 13,908 <br /> gallons per day(gpd)@ 3 mg/L TN from the permeable reactive barriers at Pirates Cove based on the <br /> estimated watershed divide on the peninsula where Pirates Cove is located. <br /> Option 1C for Popponesset Bay and East Waquoit Bay <br /> Option 1C is based on projected build-out watershed nitrogen loads and treats and discharges most of <br /> Mashpee's wastewater within the two estuary watersheds and discharges the majority of the treated <br /> effluent from Falmouth,Sandwich,and Barnstable sections of the study area outside of the watersheds. <br /> This option keeps 74%of the total study area wastewater flow(2.0 MGD)within the estuary watersheds: <br /> 18%(0.48 MGD)remains on standard septic systems,1%utilize cluster denitrifying septic systems @ 19 <br /> mg/L TN,and the remainder of flows are treated to 3 mg/L TN and are discharged at ten(10)sites within <br /> the estuary watersheds(Figure 5). Site discharges to the multiple discharge sites(i.e.,Keeter,Pirates <br /> Cove,Willowbend,and Back Roads)are assigned on the same basis as in Option 1 B. <br /> SCENARIO RESULTS: <br /> Popponesset Bay Scenario Results Comparison to Threshold Nitrogen Concentrations: <br /> Using the MEP linked model for Popponesset Bay,project staff compared the overall scenario nitrogen <br /> loads for each of the Options developed by the Sewer Commission and GHD to the threshold/TMDL <br /> loads approved by MassDEP and USEPA.'Based on this comparison,all three options meet the threshold <br /> values(fMDLs at the sentinel station for restoration of eelgrass in Popponesset Bay(Table 3). In <br /> addition,all three options do meet the water column TN concentrations within each of the three tributary <br /> sub-embayments that would be restorative of infaunal habitat. Among three Options,Option I C results in <br /> the TN concentrations closest to the TM I,thresholds(i.e.has the highest concentrations),while Options <br /> IA and IB are removing more watershed nitrogen load than necessary. It should be noted that all of these <br /> scenarios included removal of wastewater from the study area for discharge outside of the watershed and <br /> that no other alternative nitrogen reduction strategies other than improved wastewater treatment were <br /> incorporated. <br /> Eastern Waquoit Bay Scenario Results: Comparison to Threshold Nitrogen Concentrations: <br /> Using the MEP linked model for Waquoit Bay,project staff compared the overall scenario nitrogen loads <br /> for each of the Options developed by the Sewer Commission and GHD to the threshold concentrations in <br /> the Eastern Waquoit Bay MEP Report"Based on this comparison,all three options do not meet the <br /> threshold values at the sentinel station for restoration of eelgrass in dehu Pond or Hamblin Pond('Table 4). <br /> All three options do meet the water column TN concentration that would be restorative of infaunal habitat <br /> in the Quashnet River. <br /> The previous round of scenarios for Eastern Waquoit were based on the Eastern Waquoit MEP Linked <br /> model,which only included the eastern portions of the overall Waquoit Bay watershed(see Figure 1)and <br /> a water quality model that was based on three years(2001-2003)of water quality data. The whole <br /> 'Approval of Popponesset Bay System Total Maximum Daily Loads For Total Nitrogen. January 22,2008 letter <br /> from Stephen S.Perkins,Director,Office of Ecosystem Protection,USEPA,Region 1 to Laurie Burt, <br /> Commissioner,Massachusetts Department of Environmental Protection. <br /> 'TMDLs were approved for Quashnet River,Hamblin Pond,Little River,Jehu Pond,and Great River in the <br /> Waquoit Bay System on November 7,2007,but the approval letter only references nitrogen loading rates(in kg/day) <br /> rather than concentrations. Concentrations are used here, <br />
The URL can be used to link to this page
Your browser does not support the video tag.