Laserfiche WebLink
March 14,2011 <br /> Budgetary Low Pressure Sewer System Costs <br /> NEW SEABURY SITE COLLECTION AREA <br /> Quantity Description Unit Cost Installation Sub Total <br /> Valves 30 Clean Out $2,500.00 1 0.00 $75,000.00 1 <br /> _ $75,000.00 <br /> Pumps 553 I Lateral(Boundary)Kits $150.00 0.00 $82,950.00 <br /> 553 Simplex Grinder Pump Stations _ $2,800.00 0.00 $1,548,400.00 <br /> 553 Pump/Panel/lateral installation $7,500.00 0.00 $4,147,500.00 <br /> -- $5,778,850.00 <br /> Piping 8,250 2.00" Pipe $50.00 0.60 $412,500.00 <br /> 20,400 3.00" Pipe $50.00 0.00 $1,020,000.00 <br /> 7,800 4.00" Pipe $50.00 0.00 $390,000.00 <br /> 2,100 5.00"Pipe $50.00 0.00 $105,000.00 <br /> i <br /> 31550 6.00"Pipe $50.00 0.00 $177,500.00 <br /> $2,105,000.00 <br /> Other 0 Contractor Overhead $0.00 0.00 $795,885.01 <br /> 0 Contingencies $0.00 0.00 $795,885.01 <br /> -- $1,591,770.02 <br /> Number of Connections 553 <br /> Total Per Connection $14,392.13 Total(w/o other) »»»»»» $7,958,850.00 <br /> Grand Total Per Connection $17,270.56 Grand Total(including other)»»»»»» $9,550,620.02 <br /> Note: The System Costs above are based on piping sized for,and Grinder Pumps manufactured by Environment One Corporation. <br /> Page 1 F:\FRMA\Projects\EONS PROJECTS\Massachusetts\Mashpee\MASHPEE SEWER PLAN\New Seabury.E <br />