My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/15/2011 SEWER COMMISSION Minutes
>
3/15/2011 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2020 11:17:00 AM
Creation date
1/2/2019 1:50:05 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
03/15/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PRELIMINARY PRESSURE SEWER -,-. -- JMULATED RETENTION TIME (HR) <br /> Prepared By: TRANSFER STATION COLLECTION AREA <br /> March 14,2011 <br /> FRMA <br /> ---- --- _ - -( ) lineal feet- -- a - p t) --_ ,ag ---- Cats- Fluia} �A\,erage dentionlRetentionTime(Hr) <br /> - j t\ccumulated <br /> er <br /> Tini <br /> i Zone Connects to 4ccunwlated pipe Size inches Gallons er 100 Len th of Zone Ca aci of Zone IA\cra e D1ih Flo»° <br /> Number Zone Total of Pumps <br /> _this Zone L- - --- - 5171, - -- "--- <br /> This spreadsheet was calculated using pipe diameters farSDRI IHDPE Gals per Day per elling - 200 <br /> 141. 00 142.00 29 3.00 33.47 1,100.00 368.13 5,800 15.76 - 1.52 5.01 <br /> 142.00 144.00 53 4.00 55.31 1,500.00 829.70 10,600 12.78 1.88 3.49 <br /> 143.00 144. 00 8 2.00 15.40 550.00 84.72 1,600 18.89 1.27 2.88 <br /> 144.00 107.00 70 4.00 55.31 650.00 359.54 14,000 38.94 0.62 1.61 <br /> Page 5 Note:This analysis is valid only with the use of progressive cavity type grinder pumps as manufactured by Environment One <br /> F•\Frrrla\prniartc\Fnna prniarte\Airacearhncat+c\AiTachnaa\TAach.+><QPlilai'plan\Tronefcr Qta+.nn T.'nna <br />
The URL can be used to link to this page
Your browser does not support the video tag.