, f :�:•:l yi .. • �'," Sr:. yK•• `'1''••::'•! ' i' :t. ..i' ,'!i'r• L';;r'ti yy5 ;t•,I•.••':. it l
<br /> ti• •;
<br /> *
<br /> d41� i ice+.I,7y.•:.i• t�+:,J: •.''a„ •1• •, :�.� =z�'; :r.'t�"�`•'L::}'s.r,
<br /> ]D,..
<br /> ` :• `t."s•.r ::'ti;i:✓r?,K;:•L.,r.
<br /> ut � p..'i[,'1! `':ti r• •.iH•:.}�'F. .v. :�q,l•7., r. s•s'.,.s• •'f."'.� ��p �,,�, A}tn► n
<br /> 1 .t�s ,:i., �r't:� :i!=.�:`'t�+:: ..J.;:'+'��.'•' 'A•'i•�' •,e,', 1�$.TF"'•�gY`�";NBQ� �Y4'F+t :.
<br /> NMHPEE ZONING BOARD OF APPEALS
<br /> DECISION FOR A VARUNCE
<br /> V-2018-63
<br /> Gooseberry Island Trust&SN Trust Ctf:#195170
<br /> Robert D.Emmeluth,Trustee of Goosebeny Island Pian#:25249-A
<br /> 0 Gooseberry Island
<br /> (Map 100 Parcel 6-04)
<br /> Madpee,MA.02649
<br /> A Petition was Sled on November 9,2018 by Owner,Gooseberry Island Trust& -
<br /> SN Trust requesting a Variance from §174-32 of the Zoning By-'laws requiring Fire
<br /> Department apparatus access as deft nod in said Section to allow for the construction of a
<br /> single family residence on property located in an R-3 Zoning Dlstrict, at 0 Gooseberry
<br /> Island,(Map 100,Parcel 6-0-R),Ma4ee,MA.
<br /> Notice was duly given to abutters in accordance with Massachusetts General Laws
<br /> Chapter 40A.Notice was given by publication in Ike Mashpee Enterprise,a newwspaper of
<br /> general circulation in the Town of Mashpee,on November 16,2018 and November 23,
<br /> 2018 a copy of which is attached hereto and made a part hereof.
<br /> The Mashpee Zo,Hing Board of Appeals issues this Decision pursuant to the
<br /> provisions of Massachusetts General Laws Chapter 40A §10 and the Town of M bpee ;
<br /> Zoning By-laws.
<br /> Publle Hearings were held on the Petition at the Mashpee Town Hall on
<br /> Wednesday, December 12, 2018 at which time the following members of the Board of
<br /> Appeals were present and acting throughout; Chairman, Jonathan Furbush, Board :
<br /> Members,Scott Goldstein,Norman J.Gould,and Associate Members,Brad Pittsley and
<br /> Sharon Sangeleer.Also present was Attorney trate Connolly,Town Counsel,and Michael
<br /> Mendoza,Building Commissioner.
<br /> Attorney Brian Wall represented the applicant for the Variance request, Also `
<br /> present was Tom Bunker,of BSS Design,and Mathew Haney,who is a representative of
<br /> the Trust. Attorney Wall provided the Board with two plans that were dated March 11,
<br /> 2014,and July 9,2818.The 2414 plan depicts a bridge and gooseberry Island.The plan
<br /> dated July 9,2018 is of Gooseberry Island.The Island is a 3.9 acre island in Popponesset
<br /> Bay and is separated from the main land by a channel that is about 80 ft wide at high tide,
<br /> and about:40&.wide at low tide.Attorney Wall claims his client owns a strip of land along
<br /> the edge of the main land.His client would Mw to develop a single-family home on the
<br /> island,and would like to propose abridge to be built at the end of the mainland at Punkhora
<br /> Point Road across the channel to Gooseberry Island,
<br /> 1
<br />
|