My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/22/1996 BOARD OF SELECTMEN Minutes
>
4/22/1996 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 5:08:25 PM
Creation date
1/31/2019 2:41:28 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
04/22/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r er OWNER a 1�1 <br /> A]A Document <br /> 701 - Electronic Format ARCHITECT [xj <br /> CONTRACTOR x <br /> FIELDx <br /> OTHER [ ] <br /> CHANGE ORDER NUMBER: 013 <br /> PROJECT: <br /> .(name,address) <br /> Mash ee Hi h School <br /> - DATE: April 5z 1.996 <br /> Mghpee,MA - - <br /> TO CONTRACTOR: <br /> name,address} ARCHITECTS PROJECT NO. 94023 <br /> The Stone Building Com an CONTRACT DATE: Ma S 1995 <br /> 780 Allens Avenue <br /> Providence RI 02905 CONTRACT FOR: General Construction <br /> The Contract is changed as follows: <br /> 1.Add 3 <br /> " pipe support to Stair No.s 1 and 4 add a 5" header and su ort to Stair No.s 2 and 5per Change <br /> r <br /> Estimate 056, dated 412196. <br /> Not valid until signed by the Owner, Architect and Contractor. <br /> The original (Contract um was <br /> $181090100.00 <br /> $365-t104.00 change by previously authorized Change Orders <br /> The(Contract S urn) <br /> $18 45 5 104.00. <br /> prior to this Change Order was - <br /> The(Contract Sum} will be <br /> (increased)(.d by this Change Order in the amount of $5 133.00 <br /> THIS DOCUNiFNT HAS IMPORTANT LEGA. CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS <br /> ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS <br /> ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. <br /> AIA DOCUMENT G701 -CHANGE ORDER-1987 EDITION-AIA-COPYRIGHT 1987-THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AV-NUE,N.W.. <br /> WASHINGTON,D.C,,24005_5292.WARNING.Unlicensed photocopying violates U.S-copyright laws and is subject to legal prosecution.This document was electronically produced under <br /> lictase lumber 796001239 and can be reproduced without violation until 7127/96. <br /> Electronic Document Service G701-1987 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.