My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/30/1996 BOARD OF SELECTMEN Minutes
>
09/30/1996 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2019 4:25:04 PM
Creation date
2/21/2019 4:22:06 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
09/30/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> r <br /> r <br /> r <br /> D. Need for Project: <br /> The project ties together the need for safe and efficient travel <br /> through the <br /> Town of Mashpee as well as for sustainable economic <br /> completed wth. According <br /> to the <br /> recently lan ` and <br /> nablit. <br /> Development, road capacity is a major long-term infrastructure issue in <br /> Mashpee. By connecting the Mashpee Commons and the new be avail High School b <br /> bi-walk,students will g y a <br /> ed safe travel to work opportunities at the <br /> Commons. In addition,access control to the commons via theob's F` hin <br /> J � g <br /> Road/Rte. 151 site will allow for smoother traffic flow through the Commons <br /> ns <br /> I area. As the Mashpee Industrial Park begins its approved Cape cod <br /> � - PP p <br /> Commission Development Plan, there will be a need to assist in traffic mitigation <br /> measures. otherwise, if the cost burden were left exclusively to the owners <br /> jeopardized.development initiatives would be <br /> Finally, the Au at site has Ion been a safe ` <br /> g � g Mill <br /> hazard during peak work hours. .,. -� <br /> Relocation /sx al�zatlon of Sampson's MSI �. <br /> � �' p l Road and l�nka a to the Bowdv�n <br /> Road commercial and industiral businesses would provide t e roar <br /> f <br /> p margin o safety <br /> needed at that location. In addition, the ' would,,.provide better dellve <br /> � project,` �� ♦g..r.r:4.`Ir.-J•-..d..py rri•t.sa'l:.'.'_!•'•f <br /> access to both Au at and Willowbend. w m <br /> The alternative for implementing tin this project ' <br /> would <br /> P g p j be to approach the <br /> infrastructure improvements piece-meal over a <br /> longer Iong period of time. other <br /> funding sources would have to be sought,and <br /> � development,particularly <br /> at theites, would be hindered and/or possibly lost. "'AM <br /> Ovalua ting its future in Mashpee, either through closum ` <br /> U6� <br /> project would provide an added incentive fora the cow ,ate{ <br /> ► e <br /> or create an incentive for new occupancy. <br /> E <br /> By sharing public/private resources and ideas, Mashpee will sustain its valuable <br /> business cornerstones and position itself as the community of choice for n <br /> , ty new <br /> { <br /> businessesin the years to come. The Mashpee Area Business Incentive Project <br /> . P � ct <br /> is vital to accomplishing this vision and commitment. The ro`ect is an incentive <br /> for Mashpee to r P <br /> P <br /> retain and nurture successful businesses as we as an incentive <br /> I for private enterprise to remain successful in Mashpee and the commonwealth. <br /> � P <br /> f <br /> A. Use of Funds: <br /> (1) Engineering/Design (See Figure 3—Engineering and Design cost <br /> f <br /> Estimates) <br /> } <br /> (2) Construction (See Figure 4---construction cost Estimates) <br /> E <br /> (3) Easements (See Figure 5--Estimate cost for Easements) <br /> E <br /> (3) <br />
The URL can be used to link to this page
Your browser does not support the video tag.