My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/27/2019 ZONING BOARD OF APPEALS ZBA Decision
>
02/27/2019 ZONING BOARD OF APPEALS ZBA Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2023 1:18:20 PM
Creation date
3/29/2019 2:18:01 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
ZBA Decision
Meeting Date
02/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A SPECIAL PERMIT <br /> Frederick J;Naddaff, Jr. and Linda Naddaff <br /> 29 Overlook Knoll Road(Map 118 Parcel 33) <br /> Mashpee,MA 02649 <br /> SP-2019-13 <br /> Mr. Joyce discussed his Exhibit A,Assessors Field Card depicting.the existing oar <br /> port.He believes that it isriot supported by a foundation. He said it is supported by pilings* <br /> . <br /> on cement blocks,and is not enclosed on three sides. He believes a Variance is required to <br /> expand that carport into theside yard setback on Seaview Ave.He said that he agrees that <br /> this application is situated in the Popponesset Overlay District, and R-3 District:He said <br /> that the Overlay District superimposes its requirements together with the R-3 requirements. <br /> He said that the Zoning Table R-3 maximum lot coverage is 20%. He also mentioned <br /> footnote 16 of the bylaw. He.said that the applicant calculated the setback to the toe of the <br /> bank. He strongly disagrees and believes it is the top of the coastal bank. He believes <br /> anotherVariance is required because the dwelling is in excess of 22.3%. Mr. -Joyce <br /> concluded that the proposal is nearly 5,000 sq. ft. in.size. The current habitable space is <br /> 996 sq. ft. which makes the application five times the size of the current single-family . <br /> ranch. <br /> Denise Bonoli, the Architect for the project said that as the Architect she has to <br /> design a building, or dwelling to conform to the setbacks, lot coverage, and height <br /> according to the bylaws land space chart. If she were to design a garage, a carport, or a <br /> covered porch, or an uncovered deck, all of those need to conform to the requirements. In. <br /> the land use chart it says that building setback, building height,building lot coverage; the <br /> definition is.building equals structure. She said that Mr. Joyce said he acknowledges that <br /> this is astructure. This is how she is required to design the house. <br /> Attorney Kirrane wanted to comment that he believes thaf.the-carport is at a fixed . <br /> location on the ground,and is attached to the structure,and qualifies as a structure as.much <br /> as a.deck, or any other similar type structure that people do not*necessarily live in. He <br /> therefore suggests that 15 ft. is an appropriate measure from'Seaview Avenue because it's <br /> a non-conforming condition that already exists,and there's no need for variance relief. He <br /> also said that Mr. Joyce indicated that the lot coverage based upon his interpretation of the <br /> definition of lot area, and how the lot coverage should.be calculated was at 22%.,In the <br /> Popponesset Overlay District,the lot coverage parameter.is 25%; So even if you took the <br /> calculation and eliminated the distance to the toe to the bank, at 22% lot_coverage would <br /> comply at 25%. There is no creation of any new non-conformities, and any non- <br /> conformities that exist would be lessened or eliminated. <br /> GENERAL.CRITERIA: <br /> The subject property located at 29 Overlook Knoll is approximately 11,259 square <br /> feet. <br /> e <br />
The URL can be used to link to this page
Your browser does not support the video tag.