Laserfiche WebLink
.y <br /> TOWN HALL WATER MAIN PROJECT <br /> COST ESTIMATE <br /> TOWN HALL PRESENTLY HAS A 5/8" METER <br /> PROPOSED: <br /> 1" SIZE CURB STOP GOING TO 5/8" METER WATER DISTRICT FEE $500.00 <br /> SPRINKLER SYSTEM CONNECTION " 120.00 <br /> STREET TO BUILDING CONNECTION - ESTIMATED COST: 2,000.00 <br /> 2,620.00 <br /> TOTAL COST OF PROJECT(TOWN OF MASHPEE SHARE): <br /> SYSTEM INSTALLATION $73,622.00 <br /> STREET TO BLDG./FEES 2,620.00 <br /> CONTINGENCY/INTEREST 3,600.00 <br /> $79,842.00 <br /> SYSTEM WATER MAIN PROJECT CAN BE PAID OVER SEVERAL YEARS. THIS COULD BE <br /> EITHER TWO OR THREE YEARS TO MINIMIZE THE IMPACT OF THIS:IMPROVEMENT. <br />