My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/7/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
2/7/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 1:25:00 PM
Creation date
4/24/2019 1:24:38 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
02/07/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.y <br /> TOWN HALL WATER MAIN PROJECT <br /> COST ESTIMATE <br /> TOWN HALL PRESENTLY HAS A 5/8" METER <br /> PROPOSED: <br /> 1" SIZE CURB STOP GOING TO 5/8" METER WATER DISTRICT FEE $500.00 <br /> SPRINKLER SYSTEM CONNECTION " 120.00 <br /> STREET TO BUILDING CONNECTION - ESTIMATED COST: 2,000.00 <br /> 2,620.00 <br /> TOTAL COST OF PROJECT(TOWN OF MASHPEE SHARE): <br /> SYSTEM INSTALLATION $73,622.00 <br /> STREET TO BLDG./FEES 2,620.00 <br /> CONTINGENCY/INTEREST 3,600.00 <br /> $79,842.00 <br /> SYSTEM WATER MAIN PROJECT CAN BE PAID OVER SEVERAL YEARS. THIS COULD BE <br /> EITHER TWO OR THREE YEARS TO MINIMIZE THE IMPACT OF THIS:IMPROVEMENT. <br />
The URL can be used to link to this page
Your browser does not support the video tag.