My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/19/2019 BOARD OF SELECTMEN Minutes
>
08/19/2019 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2019 5:04:48 PM
Creation date
9/16/2019 1:35:24 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
08/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Open letter to the Mashpee Board of Selectmen <br /> Call to Fund Phase I of the Mashpee Comprehensive Watershed Nitrogen <br /> Management Plan <br /> August 19, 2019 <br /> Like communities across Cape Cod and, indeed,the entire nation, Mashpee is confronting a crisis that <br /> threatens our waterways,our health and, ultimately,our property values and tax base.This threat is <br /> excess nitrogen. <br /> We have been on a several decade journey to understand and figure out how to deal with this <br /> challenge. It has now been established that the sources of this nitrogen are': <br /> 82% Septic Systems <br /> 10% Fertilizer <br /> 7% Stormwater(fertilizer, pet,yard waste) <br /> 1% Wastewater Treatment Facilities <br /> This problem is getting worse.A ten-year testing project has demonstrated that the water quality in <br /> both Popponesset and Waquoit Bays is deteriorating. Many parts of these systems have been classified <br /> as "Significantly Impaired." Both systems have lost eel grass,which provides the primary habitat for the <br /> normal tidal ecosystem including shellfish." Dangerous levels of algae are growing in both our fresh and <br /> salt water systems. It is clear that this problem can only be solved through comprehensive nitrogen <br /> management.This testing was just one part of a process that took decades whereby the Town studied <br /> the problem methodically. <br /> It could have been much worse.The plan benefits from the fact that over the years,the Town has <br /> wisely required most large-scale developments to build facilities to treat their own wastewater.Today, <br /> there are 10 wastewater treatment facilities already operating in Mashpee.These are in locations such <br /> as the Mashpee Commons, New Seabury,Willowbend and the Mashpee High.These facilities are <br /> inconspicuous and do not produce the kinds of odors that many associate with water treatment. <br /> To solve this problem,Mashpee staff and citizens developed a Comprehensive Watershed Nitrogen <br /> Management Plan approved that was approved in June 2015 by the Mashpee Selectmen. It calls for <br /> reaching a nitrogen level in treated water of 3 mg/I.The only facility in Mashpee that currently achieves <br /> this is at the Mashpee Commons.The other existing facilities can be retrofitted to achieve the 3 mg/I <br /> target. Here are rough numbers on nitrogen output levels for comparison: <br /> Nitrogen levels <br /> Source (mg/0 <br /> Raw sewage 50 <br /> Outflow from average home septic 25-40 <br /> Outflow from average home de-nitrification system 15-20 <br /> Outflow from nine of Mashpee's exiting treatment facilities 5-15 <br /> Target outflow(currently met only by Mashpee Commons) 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.