Laserfiche WebLink
PIERRE VERNIER DRIVE, KATIAN WAY, GUNTER'S LANE <br /> PIMLICO HEIGHTS <br /> ESTIMATED BETTERMENT COST <br /> CONSTRUCTION $ 462,425.00 <br /> PROCESSING($5,000 ENGINEERING, $150 RECORDING FEES) $ 5,150.00 <br /> SUBTOTAL $ 467,575.00 <br /> INTEREST(5%) $ 23,378.75 <br /> TOTAL $ 490,953.75 <br /> COST TO BE BORNE BY EACH OF 35 PROPERTY OWNERS $ 14,027.25 <br /> Please be advised that this amount reflects the maximum allowable charge <br /> by the Town of Mashpee for this Betterment <br />