My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/04/2019 BOARD OF SELECTMEN Agenda Packet
TownOfMashpee
>
Town Clerk
>
Minutes
>
SELECT BOARD
>
AGENDA PACKETS
>
2010-2019
>
2019
>
11/04/2019 BOARD OF SELECTMEN Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2019 9:27:38 AM
Creation date
11/21/2019 9:25:11 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Agenda Packet
Meeting Date
11/04/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Town of Mashpee Department of s <br /> t�@�1:011N Or Works <br /> 350 Meetinghouse load <br /> Mashpee, Massachusetts 02649 <br /> rIelephone - (508)539-1420 <br /> FaX- (508)539-3894 <br /> MEMORANDUM <br /> October 30, 2019 <br /> TO: Board of Selectmen <br /> Rodney Collins,Town Manager <br /> FROM: Catherine Laurent, Director <br /> RE: Recommendation for Award of Contract for Department of Natural Resources Facility <br /> Feasibility Study/Site Selection <br /> Description <br /> One proposal was received in response to the Request for Proposals issued for a feasibility study/site <br /> selection for a facility for the Department of Natural Resources(DNR). See attached. <br /> Background <br /> The FY20 Capital Improvement Plan approved at the May 2019 Annual Town Meeting included $30,000 <br /> in funding for completion of a needs analysis for a DNR facility. The scope of work includes review of the <br /> existing DNR facilities, assessment of the Department's needs, and review of available Town properties <br /> for siting of a potential facility for the purpose of making recommendations to construct a new facility to <br /> support DNR operations. <br /> Recommendation <br /> The Planning&Construction Committee voted at their meeting of October 29, 2019 to recommend that <br /> a contract be awarded to Weston &Sampson Engineers, Inc.for a contract amount of$29,500. They <br /> have extensive experience working with other municipalities on similar projects and their proposal <br /> thoroughly outlines how the tasks in the scope of work will be accomplished. <br /> Pros and Cons <br /> Funding for construction of a facility for DNR was initially proposed for FY20 CIP at the Ockway Bay Boat <br /> Ramp. During discussions on this request, it was determined that (1)further study was needed to <br /> ensure construction of a facility that would meeting existing and future needs for the Department; and <br /> that (2)the Ockway Bay Boat Ramp may not be the appropriate location for such a facility. The <br /> recommendation from the CIP Committee was to fund instead a needs analysis and study of all available <br /> Town properties. Once this analysis and study is complete,funding for design and construction would <br /> then be sought. <br />
The URL can be used to link to this page
Your browser does not support the video tag.