Laserfiche WebLink
Possib l e G over n me n t al S ol utio n s <br /> • Lift the Moratorium on Waste-to-Energy plants. This <br /> will take at least 5 plus years, with all the stringent <br /> environmental standards that will be required <br /> • Allow more landfill permit expansions. <br /> • Reactivate closed landfill sites that may have available <br /> airspace? <br /> • Possible to have a State operated landfill similar to the <br /> Rhode Island Landfill? <br /> • Implement a statewide Organic Food Waste Ban <br /> 9 Organics account for ao 30 % of the waste stream by weight <br />