My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/15/2020 PLANNING BOARD Minutes
>
01/15/2020 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 10:32:38 AM
Creation date
3/13/2020 2:56:37 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
01/15/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Charles <br /> PLS <br /> L. Rowley, PE, <br /> Consulting Engineer and Land.Surveyor <br /> 5 Carver Road_ Tel:508-295-1881 <br /> PO Box 9 Cell:508-295-0545 <br /> West Wareham,NA 02576 E-mail: crsr63(ti),verizon.net <br /> January 13, 2020 <br /> Town of Mashpee Planning Board <br /> Town Hall . <br /> 16 Great Neck Road North <br /> Mashpee, MA 02649 <br /> Re: Services for Month of December, 2019 <br /> Attendance at two regular meetings $390.00 <br /> Inspections <br /> New Seabury Cottages III <br /> 12/6 Inspection of drainage installation at Great Oak Road <br /> 1.5 hrs. 150.00 <br /> 12/31 Inspection of central infiltration area excavation <br /> 1.0 hr. -100.00 <br /> Willowbend, Southworth Sampsons Mill Road <br /> 12/16 Inspection of road base material for depth and quality <br /> 0.5 hr. 50.00 . <br /> 12/23 Inspect final grading and compaction of road base for paving <br /> 1.0 hr. 100.00 <br /> Country Club Lane <br /> 12/16 Inspect road base material for compaction for binder <br /> 0.5 hr. 50.00 <br /> Blue Castle Drive <br /> 12/16 Inspect condition of Blue Castle Drive, Carriage Drive after receipt <br /> of complaint on condition 0.5 hr. 50.00 ' <br /> Route 151 Upgrade for sidewalks and drainage <br /> 12/16 Discussion with Catherine Laurent regarding drainage changes <br /> and sidewalk proposal 0.5 hr. 50.00 <br /> Total Amount Due $940.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.