My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/15/2020 PLANNING BOARD Minutes
>
01/15/2020 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 10:32:38 AM
Creation date
3/13/2020 2:56:37 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
01/15/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
14.A storm water management plan prepared by a Massachusetts licensed Registered Professional <br /> Engineer <br /> 15. A Site Plan, with stamp and signature of the Massachusetts licensed Registered Professional <br /> Engineer that prepared the plan, including the following: <br /> a. Everything required under this bylaw and Site Plan Approval <br /> b. Existing Conditions Plan, showing property lines, map and lot from the Assessor's records, and <br /> physical features, including roads and topography, for the entire <br /> project site, signed and sealed by a Massachusetts licensed Registered Land Surveyor <br /> c. Proposed changes to the landscape of the site, grading, vegetation clearing and planting, exterior <br /> lighting, screening vegetation, fencing or structures including their height, and placement of system <br /> components, including solar arrays and related structures and equipment <br /> d.An estimate of earthwork operations including the volume of cut and fill and the amount of soil <br /> material to be imported or exported from the site <br /> e. Locations of wetlands,vernal pools, and Priority Habitat Areas defined by the Natural Heritage & <br /> Endangered Species Program (NHESP) <br /> f. Locations of floodplain area(s) <br /> g. Zoning district designation for the parcel(s) of land comprising the project site (submission of a copy <br /> of a zoning map with the parcel(s) identified is suitable for this purpose) <br /> h. Materials storage and delivery and equipment staging area(s) <br /> i. Location of screening vegetation or structures <br /> G. Dimensional Regulations <br /> 1. Ground-mounted soil energy systems shall be set ck a distance of at least 50 feet from a public <br /> way.The Planning Ulard may reduce the minimu etback distance as appropriate based on si - <br /> /Ground- <br /> de tions. <br /> unted solar energy systems all be set back a distance of at least 125 fee rom any <br /> idence, and 100 feet fro any property in residential use and roadways. or the purposes <br /> , a Residence is define as the primary living structure and not access ry uses. Thed may reduce the nimum setback distance as appropriate based n site-specific <br /> considerations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.