My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/15/2020 PLANNING BOARD Minutes
>
01/15/2020 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 10:32:38 AM
Creation date
3/13/2020 2:56:37 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
01/15/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
inquired whether he would consider Mr. Rowley's recommendation to maintain 3 inches. Mr. <br /> Aggerbeck agreed to 3 inches but stated that the Board could not demand more than what was required <br /> in the Bylaw. The Chair and Mr. Balzarini stated they were not making a demand but asking if he <br /> would accept the change in the plans to ensure that the information was properly communicated. <br /> Mr. Balzarini inquired about the removal of the sidewalks and Mr. Catignani responded that seashells <br /> and landscaping would be added. It was confirmed that the gravel area would remain for employee <br /> parking,without striping. Mr. Balzarini inquired about accessibility and Mr. Catignani responded that <br /> handicap parking was located atthe front door of the building. Concrete would remain in the covered <br /> porch and would continue to be accessible. <br /> Mr. Phelan referenced the gravel parking and inquired whether there was a requirement to bear a <br /> certain weight, such as would be needed for fire apparatus. Mr. Catignani responded that the same <br /> subsurface would be used throughout the pavement and the gravel. It was confirmed that the depth <br /> would be 8 inches of reclaimed material. Mr. Rowley noted that the plans did not show the catch basin <br /> in the area and Mr. Catignani responded that the drainage plans remained the same in case of future <br /> paving. Mr. Rowley inquired about grading into the catch basin, stating that additional maintenance <br /> would be necessary due to the potential for sediment entering the catch basin and attention would be <br /> necessary in the Operations and Maintenance Plan. Mr. Rowley inquired about containment around <br /> the gravel area and Mr. Catignani responded that there would be a raw edge in place of a Cape Cod <br /> berm. Mr. Rowley also pointed out a premature end to the Cape Cod berm on the south west side and <br /> Mr. Catignani confirmed that it was an error and the berm would continue to the asphalt. Mr. Rowley <br /> stated that the gravel depth should be stated as the same as under the pavement. <br /> The Chair reiterated that, in the gravel parking area, the reclaimed material, as with under the paved <br /> area, should be a minimum of 8 inches. Mr. Aggerbeck consented to the condition. In addition, it <br /> would be conditioned that the plan would be changed so that the Cape Cod berm would extend around <br /> all 6 parking spots on the south west part of the project, to the edge of the building, and at the opposite <br /> side of the spaces, the berm would extend to the end of the proposed pavement. <br /> The Chair inquired about the fence and Mr. Catignani confirmed that it would be moving closer to the <br /> building, away from the street, increasing protections from the neighbors. The fire pits would be <br /> located on the other side of the fence. By moving the fence closer, Mr. Aggerbeck confirmed that the <br /> posts would not need to be higher, reducing the potential for the fence to be blown over. <br /> Mr. Rowley suggested that the changes be made to the plan, and a new plan feature a revision date, and <br /> referenced in the modification. Mr. Rowley added that the thickness of the proposed gravel also be <br /> added to the plan, as well as a condition revising the maintenance plan to address the gravel parking <br /> lot. <br /> OTION: Mr. Balzarini made a motion that a condition be added that the maintenance plan <br /> for the catch basin in the gravel parking lot would have additional maintenance. Mr. Callahan <br /> seconded the motion. All voted unanimously. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.