My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/02/2020 BOARD OF SELECTMEN Agenda Packet
TownOfMashpee
>
Town Clerk
>
Minutes
>
SELECT BOARD
>
AGENDA PACKETS
>
2020-2029
>
2020
>
03/02/2020 BOARD OF SELECTMEN Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2020 1:31:35 PM
Creation date
9/11/2020 12:49:24 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Agenda Packet
Meeting Date
03/02/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*DRAFT I MAY 2020 TOWN MEETING WARRANT* Page 32 <br /> F. Special Permits Rules and Application Requirements <br /> A Solar Energy System Special Permit shall not be granted unless each, of the following <br /> requirements/ submittals, in addition to the requirements of §174-24 C Special Permit use, <br /> are satisfied: <br /> 1. A properly completed and executed application form and application fee; <br /> 2. Any requested waivers; <br /> 31. Name, address, phone number and signature of the project proponent, as wellil as all co- <br /> proponents or property owners, if any-, <br /> 4. Namel contact information and signature of any agents representing the project <br /> proponent; <br /> 5. Name, address, and contact information for proposed system'install�er; <br /> 6. Documentation of actual or prospective access, and control of the project site sufficient to <br /> allow for construction and operation of the proposed solar energy system; <br /> 7. Proposed hours of operation and construction activity; <br /> 8. Blueprints or drawings of the solar energy system signed by a Massachusetts licensed <br /> Registered Professional Engineer shoving the proposed, layout of the system and any <br /> potential shading from nearby structures; <br /> 9. Utility Notification - evidence that the utility company that operates, the electrical grid <br /> where a grid-intertie solar energy system is to be located has been informed of the system <br /> owner or operator's intent to install an interconnected facility and acknowledges receipt <br /> of such notification, and a copy of an Interconnection Application! filed with the utility <br /> including a one or three line electrical diagram dietailing the solar electric installation, <br /> associated components, and electrical interconnection methods, with all Massachusetts <br /> Electrical Code (527 CMR § 12.00) compliant disconnects and overcurrent dievices. Off-grid <br /> solar energy systems shall be exempt from this requirement; <br /> 10. Documentation of the major system components to be, used, including the electric <br /> generating components, battery or other electric storage systems, transmission systems, <br /> mounting system, inverter, etc.; <br /> 11. Preliminary Operation & Maintenance Plan for the soliar energy system,which shall include <br /> measures for maintaining safe access to the, installation, storm water management, <br /> vegetation, controls, and general procedures for operational, maintenance of the <br /> installation; <br /> 12. Abandonment & Decommissioning Plan -Any ground-mounted solar energy system which <br /> has reached the end of its useful life'or has been abandoned (i.e., when it fails to operate <br /> for more than one year without the written consent of the Planning Board) shall be <br /> removed. The owner or operator shall physically remove the installation within, 150 days <br /> of abandonment or the proposed date of decommissioning. The owner or operator shall <br /> notify the Planning Board by certified mail of the proposed date of discontinued operations <br /> and plans for removal.The Abandonment & Decommissioning Plan shall inclu'de a detailed <br /> description of how all of the following will be addressed. <br /> a. Physical removal of all structures; equipment, building, security barriers awed <br /> transmission lines from the site, including any materials used to limit vegetation. <br /> b. Disposal of all solid and hazardous waste in accordance with local, state, and <br /> federal waste disposal regulations,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.