Laserfiche WebLink
it <br /> I <br /> gpft <br /> ATfurdable Waste at r <br /> M Amp AlIlliftillm waft elm <br /> The Township of Hillsdale, Wickfoi d Village, Glenwood,Alabama Mobile,Alabama <br /> Rhode Island S tern s ze System size: <br /> o <br /> New York 13G connections 11 separate systems sal vice 38 <br /> System size: System r subdivisions <br /> 72 corn servicing ril Ing 120 80 Tousling units and community This community needed a collection sys <br /> homes and businesses;35,b00 gpd bu�ldmys .50,6 gpd design flow• tem to transport its sewage to the near- with more than a dozen utility-maintained I <br /> ark municipal sewer Unfortunately,the decentralized systems In the region,we- <br /> A classic New Englanovfllage between the A regional developer wanted to correct a nearest municipal sewer was seven mites bile one become ashowcase for Orenco's <br /> HudsonValleyand the Be ksNres,Hillsdalemilitary housing complex In the Wokford away.Glenwood selected an Orenco at- wastewater achnologles South Alabama <br /> has beautiful countryside,a quaint inwn Village area to affordable housing.But re- fluent sevaer lost uses an underground UBlltles maintains most of them.In the late <br /> square, well-to-do "weekenders" from placing or rehabilitating the outdated and to at each home voter a IIghN eight but 191 the managers of this water and �I <br /> Manhattan,and failing septic systems.In oflltration-prone gravity collection system powerhtl'112-hp pump,which pumps the gas utility realized they needed to provide <br /> fact,the town has been under a consent ser ing the complex would have been it erect effluent to the neighboring city, wastewater services o new subdivisions <br /> order from the sche's Department of En- prohlbinvely expensive because of the Without a single III station.Small dram- or risk losing customer share.Since then, <br /> vironmental Conservation since 1990, gas,electric,and water Imes surround- eter pipes(2-In,to 6-In.)were used for SAU has installed Orenco effluent sewer <br /> Hillsdale's consulting engineers, Clark inn It.As an alternative,the consulting the service lines and main Imes,which roller on systems se ing 38 subdivi <br /> Enginee ng&Surveying,recommended engineer recommended that two-inch were Installed following he con ours sions,followed by 11 Advamex treatment <br /> an Orencoe effluent sewer followed by an diameter force mains be Installed Inside of the land.With an effluent sewer,no plants in various locations.When all the <br /> AdvanTex"'treatment Sys em.originaly, the existing eight-Inch diameter gravity large-diameter pipe deep excavations developments are built out,SAU's fachb <br /> the plan Included a four constructed main,eliminating the need for trench or manholes were required.The low- The will eve the capacity to handle half <br /> wetlands for evogen-polishing before Ing or boring a cund existing utilities and Impact Installation cost less and caused a-million gallons orwastowa erparday At <br /> dispersal.Because the Advanlex System reducing lnflltratan.This installation was less disruption to the community than a peak design flows,Chats enough capacity <br /> Is able to meet the TN requirement on is accomplished with minimal disruption traditional gravity sewer.And because to handle 2,000 new homes <br /> own,the town was able to remove the at an affordable cost,Following the col- the offluent Is conveyed to a neighbor- <br /> wetlands from the permit,saving approxi- Iecron system,an AdvanTex textile filter Ing sewer system,no treatment system <br /> readily$200,000 Grants and no-Inter- manufactured by Orenco processes the was needed and total project costs were <br /> est loans from a variety of sources are wastewater to advanced treatment levels substantially reduced, <br /> funding the project.Construction started before It is discharged below the surface. <br /> in fall 20075 and the system should ba <br /> fully Installed by fall 2008,Wastewater Mobtle,investedWicklaNVr7tage,Rhode island <br /> Technologies,Ina(Wrl)provided con- <br /> sultaton and equipment and will operate f7 <br /> the system for the first year,after which <br /> the Town Sewer District will become the <br /> operator and service provider.With this <br /> system In place,Hillsdale will be out from �';a .• > . r <br /> i under its consent order with a long-term, <br /> t village wide solution that protects public r 7' ,: eye <br /> health and the environment,at a toter cost .. <br /> of$15,000 per home. <br /> cow•. • r "� xe a �.> <br /> tw <br /> gThe Township of Hillsdale,New York <br /> a. 'K 'f fit ill i� i;�•I, . u ° :: <br /> sill, <br /> If <br /> x <br /> t <br />