My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/17/2010 SEWER COMMISSION Minutes
>
8/17/2010 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 3:01:15 PM
Creation date
10/2/2020 2:02:10 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
08/17/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�3 <br /> Complete, <br /> ■ a 0 , Lightweight Package <br /> ProSTEP Effluent Pumping <br /> Fr <br /> �t9 Systems are a fully-integrated <br /> __• package,with seven compatible <br /> components.No need to shop <br /> for parts and pieces.In-tank <br /> a equipment is lightweight,comes <br /> *' preassembled,and installs neatly <br /> 3^ <br /> Into most tanks,saving time and <br /> 'l money. <br /> r. <br /> .. - 3 earurrveu l,3 4114t�\r t� III <br /> rt f ��III uyi q pl� <br /> $ <br /> II i <br /> Bilat Bbe© ``r rc• <br /> Pu_P vault <br /> •Pump vault comes in <br /> standard and custom <br /> heights. <br /> •Handle assembly aids <br /> removal of filter cartridge. <br /> • Biotube filter goes longer <br /> between cleanings than <br /> t other brands. <br /> • External flow inducer bpi®c®dux <br /> • Protects splices <br /> accommodates <br /> one or two pumps. • Easy to access <br /> • Meets NEC <br /> requirements <br /> • Corrosion-proof <br />
The URL can be used to link to this page
Your browser does not support the video tag.