My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/13/2011 SEWER COMMISSION Minutes
>
12/13/2011 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2020 11:27:27 AM
Creation date
10/5/2020 11:23:22 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
12/13/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Recommended Plan[sub page] <br /> Once the alternatives evaluation and MEP's assessment of the effectiveness of each of the <br /> scenarios in nitrogen removal was complete,the Sewer Commission began development of more <br /> refined scenarios, which is currently underway. Once one or two are indentified,the Town's <br /> consultant will develop a detailed plan(s) for testing by SMaST using the MEP models. The <br /> results of those model runs will assist in the refinement of a draft Recommended Plan. We <br /> anticipate the draft recommended plan will be ready for public review and comment in late 2011 <br /> and be forwarded for approval to the Cape Cod Commission, Massachusetts Environmental <br /> Protection Act(MEPA) office and the Massachusetts Department of Environmental Protection <br /> (MassDEP). It will include phasing, implementation and monitoring plans to allow the Town(s) <br /> to focus on areas of the PPA that are currently developed and producing wastewater nitrogen <br /> loads. Once approved,the plan will serve as the basis for specific construction projects which <br /> will need funding approval by Mashpee voters. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.