Laserfiche WebLink
project site, signed and sealed by a Massachusetts licensed Registered Land <br /> Surveyor <br /> c. Proposed changes to the landscape of the site, grading, vegetation clearing and <br /> planting, exterior lighting, screening vegetation, fencing or structures including their <br /> height,-and placement of system components, including solar arrays and related <br /> structures and equipment <br /> d. An estimate of earthwork operations including the volume of cut and fill and the <br /> .amount of soil material to.be imported or exported from the site <br /> e. Locations of wetlands,vernal pools, and Priority Habitat Areas defined by the <br /> Natural Heritage &.Endangered.Species Program (NHESP) <br /> f. Locations of floodplain.areas) <br /> g. Zoning district designation for the parcel(s) of land comprising the project site <br /> (submission of a copy of a zoning map with the parcel(s) identified is suitable for this <br /> purpose) <br /> h. Materials storage and delivery and equipment staging area(s) <br /> L Location of screening vegetation or structures <br /> G. Dimensional Regulations <br /> 1. Ground-mounted solar energy systems shall beset back a distance of at least 50 feet from a public <br /> way. The Planning Board may reduce the minimum setback distance as appropriate based on site- <br /> specific considerations. <br /> 2. Ground-mounted solar energy systems shall be set back a distance of at least 125 feet from any <br /> inhabited Residence,and 100 feet from any property in residential use. For the purposes of this <br /> section,a`Residence is defined as the primary.living structure and not accessory uses. The Planning <br /> Board may reduce the minimum setback distance as appropriate based on site-specific <br /> considerations. <br /> 3. Ground-mounted solar energy systems shall be set back a distance of at least 50 feet from any <br /> commercial property.or use, and 25 feet from any industrial property or use. The Planning Board <br /> may reduce the minimum setback distance as appropriate based on site-specific considerations. <br /> 4. Ground-mounted solar energy systems shall be set back a distance of at least 15 feet from abutting <br /> conservation land and.any property not included in the Ground-mounted solar array application. <br /> The Planning Board may reduce the minimum setback distance as appropriate based on site- <br /> specific considerations. <br /> S. Fixed tilt Ground-mounted solar energy systems shall have a.maximum height of 15 feet above <br /> grade. . In the case of single or dual axis tracking Ground-mounted solar energy systems, the <br /> Planning Board may increase the maximum height as appropriate based on site-specific <br /> considerations. <br /> 6. Inverters,energy storage systems,and transmission system substations shall be set back a distance <br /> of at least 200 feet from any residence. The Planning Board may reduce the minimum setback <br /> distance as appropriate based on site-specific considerations. <br />