Laserfiche WebLink
9. Land Clearing and Soil Erosion—Clearing of natural vegetation and topsoil shall be limited to <br /> what is necessary for the construction,operation and maintenance of the ground-mounted <br /> solar energy system. No-topsoil removed during construction shall be exported from the <br /> site. <br /> 10. Emergency Services—T.he ground-mounted solar energy system owner or operator shall <br /> provide a copy of the project summary, electrical schematic, and.site plan to the Mashpee <br /> Fire Department, and any other neighboring Fire Department upon request. Upon request <br /> the owner or,operator shall cooperate with local emergency services.in developing an <br /> emergency response.plan. All means of shutting down the solar energy system shall be. <br /> clearly marked.The owner or operator shall identify a responsible person for public <br /> inquiries throughout the life of the installation. <br /> I. The Planning.Board may, upon the prior written request of the applicant, waive any of the <br /> requirements of this Section, but must state their reasons for doing so in writing as part of their <br /> decision. <br /> Submitted by Planning Board <br /> EXPLANATION <br />