My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/04/2019 PLANNING BOARD Minutes
>
12/04/2019 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 9:50:00 AM
Creation date
10/26/2020 3:07:42 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
12/04/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9. Land Clearing and Soil Erosion—Clearing of natural vegetation and topsoil shall be limited to <br /> what is necessary for the construction,operation and maintenance of the ground-mounted <br /> solar energy system. No-topsoil removed during construction shall be exported from the <br /> site. <br /> 10. Emergency Services—T.he ground-mounted solar energy system owner or operator shall <br /> provide a copy of the project summary, electrical schematic, and.site plan to the Mashpee <br /> Fire Department, and any other neighboring Fire Department upon request. Upon request <br /> the owner or,operator shall cooperate with local emergency services.in developing an <br /> emergency response.plan. All means of shutting down the solar energy system shall be. <br /> clearly marked.The owner or operator shall identify a responsible person for public <br /> inquiries throughout the life of the installation. <br /> I. The Planning.Board may, upon the prior written request of the applicant, waive any of the <br /> requirements of this Section, but must state their reasons for doing so in writing as part of their <br /> decision. <br /> Submitted by Planning Board <br /> EXPLANATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.