Laserfiche WebLink
Case 1:19-cv-12333 Document 1 Filed 11/13/19 Page 14 of 21 <br /> e) Final NEPA Summary Report <br /> f) DRI Decision from the Cape Cod Commission <br /> g) Variance Decision <br /> h) Verizon Wireless'FCC Licenses <br /> i) Verizon Wireless'Radio Frequency Report, Coverage Maps and Drive-Test Data <br /> j) Letter from Keith Vellante, Radio Frequency Engineer on behalf of Verizon Wireless, on <br /> Feasibility of Alternative Technology <br /> k) T-Mobile's.FCC Licenses <br /> 1) T-Mobile's Statement of Need,Existing and Proposed Coverage Maps,and Drive-Test Data <br /> m) T-Mobile's Supplemental Radio Frequency Affidavit <br /> n) Alternative Site Analysis <br /> o) FairMarket Advisors Property Values Study <br /> p) FAA Determination of No Hazard <br /> q) Sound Impact Assessment Study <br /> r) Radio Frequency Emissions Compliance Report <br /> 114, The Board held hearings on the Proposed Site on August 16;2019 and August 23,2019. <br /> 115. Section 174-45.3 of the Mashpee Zoning Bylaws regulates personal wireless service <br /> facilities in the Town of Mashpee. <br /> 116. During the course of the proceedings before the Board,Blue Sky,Verizon Wireless and T- <br /> Mobile provided extensive expert testimony to corroborate and support its filings. <br /> 117. Keith Vellante,Radio Frequency Engineer from C Squared Systems on behalf of Verizon <br /> Wireless, and Richard Kariuki,Radio Frequency Engineer from T-Mobile,testified concerning a <br /> number of issues including Verizon Wireless' and T-Mobile's significant coverage gap at this <br /> location in south Mashpee,Verizon Wireless and T-Mobile's capacity issues in this area in south <br /> Mashpee, how the site is an effective solution for the coverage and capacity problems at this <br /> location,propagation studies, drive test data,alternative technology,height of the proposed tower, <br /> size and extent of the coverage gap,alternative sites, and affected users. <br /> 118. Jesse Moreno, project'engineer from ProTerra Design Group, testified concerning the <br /> engineering of the site and adequately addressed all issues and questions raised by the Town's <br /> engineer. <br /> 119. Mark Correnti, Certified Appraiser from FairMarket Advisors, LLC, discussed the <br /> methodology of assessing a personal wireless service facility's impact on residences,and discussed <br /> his findings that the Proposed Site in Mashpee will not negatively impact nearby property values. <br /> 14 <br />